---
description: Is Katy a good data center market for power? DCPI verdict CAUTION, score 45.8/100 (ERCOT), as of 2026-11-12. 100 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Katy data centers: power, grid and capacity | DC Hub"
---

# Katy data center market

Power availability in Katy: DCPI verdict CAUTION, composite score 45.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 233 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Katy data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Katy market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.8/100**

MW, all listings**100**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Katy at a glance

Katy has 100 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are ServerFarm (100 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 100 |
| Total listed | 100 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Katy

DC Hub does not hold a lease-rate figure for this market yet.

Katy's tracked data center footprint comprises five facilities operated by EdgeConneX (two distinct entities), Element Critical, ServerFarm, and Skybox. The market shows fragmented operator presence with no single dominant player. Only one tracked site publicly reports power capacity figures, limiting visibility into aggregate supply metrics for the market.

The DCPI verdict of CAUTION reflects conflicting signals on power availability. Operators planning capacity expansion should expect power procurement to require longer lead times or premium terms relative to unconstrained markets.

No recent deals have been tracked in Katy's registry. This absence of M&A or capacity transaction activity reflects either stable operator holdings or limited third-party acquisition flow in the market. Without recent transaction data, operator capital plans, growth timelines, or exit intentions remain opaque.

Katy's position within the greater Houston market area positions it as a potential secondary site for operators seeking alternatives to core urban corridors, though no deal activity has materialized to confirm that interest locally.

## Data centers in Katy

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [ServerFarm HTX1 Houston](https://dchub.cloud/facilities/serverfarm-serverfarm-htx1-houston-340c2985) | ServerFarm | Operational | 100 |
| [EdgeConneX Houston (EDCHOU01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-houston-edchou01-7b9b8676) | EdgeConneX Inc. | Operational |  |
| [Element Critical Houston HOU1](https://dchub.cloud/facilities/element-critical-llc-element-critical-houston-hou1-7cc10d46) | Element Critical, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Katy

- [Katy DCPI score](https://dchub.cloud/dcpi/katy)
- [Katy market brief](https://dchub.cloud/markets/katy/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Katy DCPI verdict changes

Email me when Katy's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Katy: 100 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=katy) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=katy)

JSON: [/api/v1/markets/katy/deep-dive](https://dchub.cloud/api/v1/markets/katy/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Katy","item":"https://dchub.cloud/markets/katy"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Katy Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:03:47.472511+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/katy",
 "wordCount":233,
 "about":{"@type":"Place","name":"Katy"},
 "description":"Live data-center market analysis. DCPI score 45.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "katy", "name": "Katy Data Center Market — DC Hub", "description": "Live data-center market measurements for Katy, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/katy", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Katy"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 100.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:40."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:40.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:40."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/katy#webpage", "url": "https://dchub.cloud/markets/katy", "name": "Katy data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Katy data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Katy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Katy data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Katy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
