---
description: Is Kapolei a good data center market for power? DCPI verdict AVOID, score 24.5/100 (HECO), as of 2026-11-12. 3 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Kapolei data centers: power, grid and capacity | DC Hub"
---

# Kapolei data center market

Power availability in Kapolei: DCPI verdict AVOID, composite score 24.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 233 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Kapolei data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Kapolei market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.5/100**

MW, all listings**3**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Kapolei

DC Hub does not hold a lease-rate figure for this market yet.

Kapolei's tracked data center footprint comprises three facilities operated by AlohaNAP, HAWAII PACIFIC DATA LLC, and Hawaii Pacific Teleport LP, with fragmented ownership and limited transparency on aggregate capacity. One facility reports measurable MW output, though total market capacity remains undisclosed. The operator base shows no dominant player, with each entity managing a single tracked site. No recent deals have been recorded in this market segment.

Together, these readings mean that securing new power for additional capacity or facility expansion will face friction—whether through grid upgrade timelines, interconnection queues, or utility coordination. This combination does not preclude new power but indicates that power acquisition will likely require project-specific negotiation or infrastructure investment rather than plug-and-play availability.

Kapolei's deal pipeline is inactive on the tracked record. The absence of recent transactions, combined with the three-operator, one-site-per-operator structure, suggests a mature, static market with limited M&A or greenfield development momentum.

Power availability will remain the primary variable affecting Kapolei's viability for new data center projects, and any material change in supply conditions or grid modernization would merit immediate reassessment.

## Data centers in Kapolei

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AlohaNAP](https://dchub.cloud/facilities/hawaii-pacific-data-llc-alohanap-a40cc537) | HAWAII PACIFIC DATA LLC | Operational |  |
| [AlohaNAP Datacenter](https://dchub.cloud/facilities/alohanap-alohanap-datacenter-17c1bbca) | AlohaNAP | Operational |  |
| [Hawaii Pacific Teleport](https://dchub.cloud/facilities/hawaii-pacific-teleport-lp-hawaii-pacific-teleport-0956dded) | Hawaii Pacific Teleport LP | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Hawaii](https://dchub.cloud/facilities/in/us/hawaii).

## More on Kapolei

- [Kapolei DCPI score](https://dchub.cloud/dcpi/kapolei)
- [Kapolei market brief](https://dchub.cloud/markets/kapolei/brief)
- [Hawaii data center market brief](https://dchub.cloud/states/hawaii/brief)
- [Hawaii data center tax incentives](https://dchub.cloud/states/hawaii/data-center-incentives)

### Email me when the Kapolei DCPI verdict changes

Email me when Kapolei's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Kapolei: 3 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=kapolei) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=kapolei)

JSON: [/api/v1/markets/kapolei/deep-dive](https://dchub.cloud/api/v1/markets/kapolei/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Kapolei","item":"https://dchub.cloud/markets/kapolei"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Kapolei Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:03:39.127726+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/kapolei",
 "wordCount":233,
 "about":{"@type":"Place","name":"Kapolei"},
 "description":"Live data-center market analysis. DCPI score 24.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "kapolei", "name": "Kapolei Data Center Market — DC Hub", "description": "Live data-center market measurements for Kapolei, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/kapolei", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Kapolei"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 3.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:27."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:27.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:27."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/kapolei#webpage", "url": "https://dchub.cloud/markets/kapolei", "name": "Kapolei data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Kapolei data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Kapolei market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Kapolei data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Kapolei market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
