---
description: Is Jersey City a good data center market for power? DCPI verdict AVOID, score 22.1/100 (PJM), as of 2026-11-12. 100 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Jersey City data centers: power, grid and capacity | DC Hub"
---

# Jersey City data center market

Power availability in Jersey City: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Jersey City data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Jersey City market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.1/100**

MW, all listings**100**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.3. The index is recomputed through the day and reads 22.1 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Jersey City

DC Hub does not hold a lease-rate figure for this market yet.

The market's largest single operator presence is concentrated but modest—no single player dominates the footprint the way peers like Equinix do in adjacent New Jersey markets.

The DCPI verdict flags procurement difficulty for new power supply. Together, these metrics indicate that new projects entering Jersey City will face extended interconnection timelines and elevated infrastructure investment requirements to unlock additional megawatts from the grid.

No recent deals have been tracked in Jersey City's market. Operator activity remains static across the five primary players, with Inap Jersey, QTS, Colt Technology Services New Jersey, and Enzu each maintaining two facilities. Centersquare operates one tracked site. The absence of recent transaction data reflects a quiet market without visible M&A, new site acquisitions, or capacity transactions among tracked operators in the period under review.

Power availability will continue shaping feasibility for any new build or major expansion in Jersey City through 2027.

## Data centers in Jersey City

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Dataverge Jersey City](https://dchub.cloud/facilities/dataverge-inc-dataverge-jersey-city-cbef7355) | Dataverge Inc. | Operational |  |
| [Level(3) Jersey City](https://dchub.cloud/facilities/lumen-technologies-level3-jersey-city-a8824bdc) | Lumen Technologies | Operational |  |
| [Newport Financial Center](https://dchub.cloud/facilities/lefrak-organization-newport-financial-center-26341fc7) | Lefrak Organization | Operational |  |
| [QTS Jersey City (JCY1)](https://dchub.cloud/facilities/qts-qts-jersey-city-jcy1-86f3a351) | QTS | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Jersey City

- [Jersey City DCPI score](https://dchub.cloud/dcpi/jersey-city)
- [Jersey City market brief](https://dchub.cloud/markets/jersey-city/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Jersey City DCPI verdict changes

Email me when Jersey City's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Jersey City: 100 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=jersey-city) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=jersey-city)

JSON: [/api/v1/markets/jersey-city/deep-dive](https://dchub.cloud/api/v1/markets/jersey-city/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Jersey City","item":"https://dchub.cloud/markets/jersey-city"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Jersey City Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:03:14.601253+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/jersey-city",
 "wordCount":260,
 "about":{"@type":"Place","name":"Jersey City"},
 "description":"Live data-center market analysis. DCPI score 22.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "jersey-city", "name": "Jersey City Data Center Market — DC Hub", "description": "Live data-center market measurements for Jersey City, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/jersey-city", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Jersey City"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 100.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:12."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:12.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:12."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/jersey-city#webpage", "url": "https://dchub.cloud/markets/jersey-city", "name": "Jersey City data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Jersey City data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Jersey City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Jersey City data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Jersey City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
