---
description: Is Jacksonville a good data center market for power? DCPI verdict AVOID, score 30.8/100 (FRCC), as of 2026-11-12. 21 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Jacksonville data centers: power, grid and capacity | DC Hub"
---

# Jacksonville data center market

Power availability in Jacksonville: DCPI verdict AVOID, composite score 30.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 255 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Jacksonville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Jacksonville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.8/100**

MW, all listings**21**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Jacksonville at a glance

Jacksonville has 21 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Cologix (16 MW) and Flexential (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 21 |
| Total listed | 21 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Jacksonville

DC Hub does not hold a lease-rate figure for this market yet.

Flexential operates the largest portfolio with five facilities, followed by Cologix with three and two other operators with two sites each.

New entrants or expansion-stage operators will face prolonged interconnection discussions and potential upgrade costs typical of markets where utility infrastructure has not kept pace with data center growth trajectories seen elsewhere.

Deal flow remains sparse. No recent deals beyond the Landmark Dividend transaction are currently tracked in Jacksonville, and the operator landscape remains stable with no consolidation or major shifts in site control. Flexential's five-site footprint establishes it as the market's leading operator, though no single player dominates sufficiently to shape pricing or procurement dynamics. The absence of announced greenfield or acquisition pipelines suggests measured growth expectations rather than competitive buildup.

Power availability will likely remain the binding variable for any material expansion in Jacksonville's data center footprint.

## Data centers in Jacksonville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cologix Jacksonville](https://dchub.cloud/facilities/cologix-cologix-jacksonville-f3487de3) | Cologix | Operational | 16 |
| [Flexential Jacksonville](https://dchub.cloud/facilities/flexential-flexential-jacksonville-ed3749c4) | Flexential | Operational | 5 |
| [Cologix JAX1](https://dchub.cloud/facilities/cologix-inc-cologix-jax1-04975022) | Cologix, Inc. | Operational |  |
| [Flexential - Jacksonville (JAX1/2)](https://dchub.cloud/facilities/flexential-corp-flexential-jacksonville-jax12-afd128d7) | Flexential Corp. | Operational |  |
| [Flexential Jacksonville FL](https://dchub.cloud/facilities/flexential-flexential-jacksonville-fl-f6f8cf26) | Flexential | Operational |  |
| [Jacksonville, Florida](https://dchub.cloud/facilities/flexential-jacksonville-florida-a5afc898) | Flexential | Operational |  |
| [Lumen Jacksonville](https://dchub.cloud/facilities/lumen-technologies-lumen-jacksonville-70e9a188) | Lumen Technologies | Operational |  |
| [ScaleMatrix Jacksonville Data Center US-South 02](https://dchub.cloud/facilities/scalematrix-holdings-inc-scalematrix-jacksonville-data-center-us-south-02-8120d176) | ScaleMatrix Holdings, Inc. | Operational |  |
| [TierPoint Jacksonville](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-jacksonville-99e47756) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Florida](https://dchub.cloud/facilities/in/us/florida).

## More on Jacksonville

- [Jacksonville DCPI score](https://dchub.cloud/dcpi/jacksonville)
- [Jacksonville market brief](https://dchub.cloud/markets/jacksonville/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Jacksonville DCPI verdict changes

Email me when Jacksonville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Jacksonville: 21 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=jacksonville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=jacksonville)

JSON: [/api/v1/markets/jacksonville/deep-dive](https://dchub.cloud/api/v1/markets/jacksonville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Jacksonville","item":"https://dchub.cloud/markets/jacksonville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Jacksonville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:03:06.133638+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/jacksonville",
 "wordCount":255,
 "about":{"@type":"Place","name":"Jacksonville"},
 "description":"Live data-center market analysis. DCPI score 30.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "jacksonville", "name": "Jacksonville Data Center Market — DC Hub", "description": "Live data-center market measurements for Jacksonville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/jacksonville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Jacksonville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 21.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:06."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:06.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:06."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/jacksonville#webpage", "url": "https://dchub.cloud/markets/jacksonville", "name": "Jacksonville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Jacksonville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Jacksonville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Jacksonville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Jacksonville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
