---
description: Is Irvine a good data center market for power? DCPI verdict BUILD, score 59.9/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Irvine data centers: power, grid and capacity | DC Hub"
---

# Irvine data center market

Power availability in Irvine: DCPI verdict BUILD, composite score 59.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 192 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Irvine data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Irvine market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**59.9/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in Irvine

DC Hub does not hold a lease-rate figure for this market yet.

Irvine operates seven tracked facilities across three primary operators, with DataBank controlling four sites and Centersquare operating two. The market's infrastructure reflects established consolidation around a small operator base, indicating mature site density rather than greenfield expansion. Current tracked facility count and operator concentration suggest a stabilized competitive landscape with limited new entrant activity.

This combination positions new power acquisition as viable without severe grid access penalties.

Deal flow in Irvine remains inactive in the tracked window, with no recent transactions recorded.

The power environment supports new builds or expansions, but execution depends on site-level interconnection readiness and transmission availability between generator capacity and specific facility locations within Orange County's grid topology.

## Data centers in Irvine

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centersquare Los Angeles (LAX3)](https://dchub.cloud/facilities/centersquare-centersquare-los-angeles-lax3-40ba5b71) | Centersquare | Operational |  |
| [Centersquare Los Angeles (LAX5)](https://dchub.cloud/facilities/centersquare-centersquare-los-angeles-lax5-dc2146cd) | Centersquare | Operational |  |
| [DataBank Irvine (SNA1)](https://dchub.cloud/facilities/databank-databank-irvine-sna1-caacafdd) | DataBank | Operational |  |
| [DataBank Irvine (SNA2)](https://dchub.cloud/facilities/databank-databank-irvine-sna2-0b0c04ed) | DataBank | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Irvine

- [Irvine DCPI score](https://dchub.cloud/dcpi/irvine)
- [Irvine market brief](https://dchub.cloud/markets/irvine/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Irvine DCPI verdict changes

Email me when Irvine's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Irvine market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=irvine) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=irvine)

JSON: [/api/v1/markets/irvine/deep-dive](https://dchub.cloud/api/v1/markets/irvine/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Irvine","item":"https://dchub.cloud/markets/irvine"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Irvine Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:02:41.688608+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/irvine",
 "wordCount":192,
 "about":{"@type":"Place","name":"Irvine"},
 "description":"Live data-center market analysis. DCPI score 59.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "irvine", "name": "Irvine Data Center Market — DC Hub", "description": "Live data-center market measurements for Irvine, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/irvine", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Irvine"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 59.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:08."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:08.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:08."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/irvine#webpage", "url": "https://dchub.cloud/markets/irvine", "name": "Irvine data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Irvine data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Irvine market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Irvine data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Irvine market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
