---
description: Is Hyderabad a good data center market for power? DCPI verdict AVOID, score 15.7/100 (POSOCO), as of 2026-11-12. 40 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Hyderabad data centers: power, grid and capacity | DC Hub"
---

# Hyderabad data center market

Power availability in Hyderabad: DCPI verdict AVOID, composite score 15.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Hyderabad data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Hyderabad market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**15.7/100**

MW, all listings**40**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Hyderabad at a glance

Hyderabad has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 40 |
| Total listed | 40 |

## Developers building or planning in Hyderabad

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Microsoft | 40 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Hyderabad

DC Hub does not hold a lease-rate figure for this market yet.

Microsoft and Amazon Web Services each maintain significant operations—Microsoft with two facilities and AWS with one—alongside a fourth CtrlS entity. The region has emerged as a cloud infrastructure node following Microsoft's launch of the India South Central region anchored in Hyderabad, supported by the vendor's commitment to zero-water cooling at its local facility.

Together, these metrics point to meaningful barriers for operators seeking to expand existing facilities or deploy new sites. Power procurement from the grid carries elevated complexity and lead times typical of markets where supply allocations are tightly matched to existing demand.

No recent tracked deals have been recorded in Hyderabad's data center market. At the operator level, CtrlS Datacenters Ltd maintains the strongest on-ground presence with multiple operational sites, while hyperscalers Microsoft and AWS have anchored their regional cloud strategies here rather than through transactional activity. This pattern—infrastructure commitments by major vendors paired with the absence of acquisition or lease activity in tracked records—characterizes a market in early consolidation around core cloud region deployments.

Power availability will remain the primary limiting factor for incremental capacity additions in Hyderabad's data center corridor.

## Data centers in Hyderabad

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Mekaguda India](https://dchub.cloud/facilities/microsoft-microsoft-mekaguda-india-12ca7ac6) | Microsoft | Under Construction | 40 |
| [AWS AP South 2 (Hyderabad)](https://dchub.cloud/facilities/amazon-web-services-aws-ap-south-2-hyderabad-1377e3ad) | Amazon Web Services | Operational |  |
| [AdaniConneX Hyderabad](https://dchub.cloud/facilities/adaniconnex-adaniconnex-hyderabad-75eeabbf) | AdaniConneX | Operational |  |
| [CtrlS Hyderabad DC](https://dchub.cloud/facilities/ctrls-ctrls-hyderabad-dc-d34695e8) | CtrlS | Operational |  |
| [Iron Mountain Data Center - Hyderabad (HYD-1)](https://dchub.cloud/facilities/iron-mountain-data-centers-iron-mountain-data-center-hyderabad-hyd-1-9603d9d7) | Iron Mountain Data Centers | Operational |  |
| [Microsoft Azure Central India (Hyderabad)](https://dchub.cloud/facilities/microsoft-microsoft-azure-central-india-hyderabad-95421add) | Microsoft | Operational |  |
| [NIXI Hyderabad](https://dchub.cloud/facilities/national-internet-exchange-of-india-nixi-hyderabad-7556fd4f) | National Internet Exchange of India | Operational |  |
| [Nxtra Data Hyderabad Edge DC1](https://dchub.cloud/facilities/nxtra-data-ltd-nxtra-data-hyderabad-edge-dc1-ce0057dc) | Nxtra Data Ltd | Operational |  |
| [Oracle Cloud India Hyderabad](https://dchub.cloud/facilities/oracle-oracle-cloud-india-hyderabad-f36c3ac3) | Oracle | Operational |  |
| [RVR Hyderabad](https://dchub.cloud/facilities/rvr-infrastructures-ltd-rvr-hyderabad-8fa6ae24) | RVR Infrastructures Ltd | Operational |  |
| [Reliance Hyderabad IDC](https://dchub.cloud/facilities/reliance-communications-limited-reliance-hyderabad-idc-98f263a8) | Reliance Communications Limited | Operational |  |
| [STTGDC HYD1](https://dchub.cloud/facilities/st-telemedia-global-data-centres-stt-gdc-stt-hyderabad-1-f16657be) | ST Telemedia Global Data Centres (STT GDC) | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [India](https://dchub.cloud/facilities/in/in).

## More on Hyderabad

- [Hyderabad DCPI score](https://dchub.cloud/dcpi/hyderabad)
- [Hyderabad market brief](https://dchub.cloud/markets/hyderabad/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Hyderabad DCPI verdict changes

Email me when Hyderabad's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Hyderabad: 40 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=hyderabad) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=hyderabad)

JSON: [/api/v1/markets/hyderabad/deep-dive](https://dchub.cloud/api/v1/markets/hyderabad/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Hyderabad","item":"https://dchub.cloud/markets/hyderabad"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Hyderabad Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:02:24.992780+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/hyderabad",
 "wordCount":256,
 "about":{"@type":"Place","name":"Hyderabad"},
 "description":"Live data-center market analysis. DCPI score 15.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "hyderabad", "name": "Hyderabad Data Center Market — DC Hub", "description": "Live data-center market measurements for Hyderabad, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/hyderabad", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Hyderabad"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 40.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 15.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:59."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:59.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:59."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/hyderabad#webpage", "url": "https://dchub.cloud/markets/hyderabad", "name": "Hyderabad data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Hyderabad data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Hyderabad market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Hyderabad data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Hyderabad market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
