---
description: Is Huntsville a good data center market for power? DCPI verdict AVOID, score 23.0/100 (SOCO), as of 2026-11-12. 85 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Huntsville data centers: power, grid and capacity | DC Hub"
---

# Huntsville data center market

Power availability in Huntsville: DCPI verdict AVOID, composite score 23 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 192 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Huntsville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Huntsville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.0/100**

MW, all listings**85**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Huntsville at a glance

Huntsville has 55 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (30 MW) and DC BLOX (25 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 55 |
| Total listed | 55 |

## Developers building or planning in Huntsville

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 30 |  |
| DC BLOX | 25 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Huntsville

DC Hub does not hold a lease-rate figure for this market yet.

SimpleHelix and Meta each operate two sites in the market, while DC BLOX Parent LLC, Meta Platforms, and Peace Communications each maintain one facility. The operator base remains fragmented, with no single player commanding dominant control of local infrastructure.

The DCPI verdict of AVOID reflects a critical power supply mismatch. This combination means prospective operators should expect extended procurement cycles and elevated costs for grid access.

No recent deals have been tracked in Huntsville's data center market. The operator roster remains stable with no announced entries, exits, or portfolio shifts.

## Data centers in Huntsville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Huntsville Building 5](https://dchub.cloud/facilities/meta-meta-huntsville-building-5-d7b75ce2) | Meta | Under Construction | 30 |
| [DC BLOX Huntsville](https://dchub.cloud/facilities/dc-blox-dc-blox-huntsville-56e8cbe0) | DC BLOX | Under Construction | 25 |
| [George C. Wallace Alabama Supercomputer Center](https://dchub.cloud/facilities/alabama-supercomputer-authority-george-c-wallace-alabama-supercomputer-center-240eaffb) | Alabama Supercomputer Authority | Operational |  |
| [Meta Huntsville Data center](https://dchub.cloud/facilities/meta-meta-huntsville-data-center-afae9123) | Meta | Operational |  |
| [Peace Communications HSV1](https://dchub.cloud/facilities/peace-communications-peace-communications-hsv1-d6f962d7) | Peace Communications | Operational |  |
| [SimpleHelix](https://dchub.cloud/facilities/simplehelix-simplehelix-15eb2dc4) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Alabama](https://dchub.cloud/facilities/in/us/alabama).

## More on Huntsville

- [Huntsville DCPI score](https://dchub.cloud/dcpi/huntsville)
- [Huntsville market brief](https://dchub.cloud/markets/huntsville/brief)
- [Alabama data center market brief](https://dchub.cloud/states/alabama/brief)
- [Alabama data center tax incentives](https://dchub.cloud/states/alabama/data-center-incentives)

### Email me when the Huntsville DCPI verdict changes

Email me when Huntsville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Huntsville: 85 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=huntsville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=huntsville)

JSON: [/api/v1/markets/huntsville/deep-dive](https://dchub.cloud/api/v1/markets/huntsville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Huntsville","item":"https://dchub.cloud/markets/huntsville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Huntsville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:02:13.614391+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/huntsville",
 "wordCount":192,
 "about":{"@type":"Place","name":"Huntsville"},
 "description":"Live data-center market analysis. DCPI score 23.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "huntsville", "name": "Huntsville Data Center Market — DC Hub", "description": "Live data-center market measurements for Huntsville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/huntsville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Huntsville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 85.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:37."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:37.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:37."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/huntsville#webpage", "url": "https://dchub.cloud/markets/huntsville", "name": "Huntsville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Huntsville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Huntsville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Huntsville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Huntsville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
