---
description: Is Honolulu a good data center market for power? DCPI verdict AVOID, score 24.5/100 (HECO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Honolulu data centers: power, grid and capacity | DC Hub"
---

# Honolulu data center market

Power availability in Honolulu: DCPI verdict AVOID, composite score 24.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 233 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Honolulu data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Honolulu market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Honolulu

DC Hub does not hold a lease-rate figure for this market yet.

The market's operator base is fragmented: Hawaiian Telcom Honolulu, Centurylink Honolulu, DRFortress LLC, and DRFortress Drfortress each operate single facilities. No transactions have been tracked in the recent period, and individual facility capacity reporting remains sparse across the market.

Together these readings reflect a market where new power procurement will face both availability limits and operational complexity. Operators cannot assume straightforward power additions; grid interconnection timelines and supply allocation are active friction points.

No tracked recent deals provide visibility into current transaction activity or operator expansion plans in Honolulu. The absence of deal flow—combined with the fragmented operator roster and single-site concentration among most players—suggests limited near-term M&A or greenfield announcement velocity. Servpac Inc.'s two-site footprint represents the only meaningful scale among tracked operators, though no announced activity signals near-term growth initiatives from any player.

## Data centers in Honolulu

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DRFortress HNL](https://dchub.cloud/facilities/drfortress-llc-drfortress-hnl-fe951411) | DRFortress LLC | Operational |  |
| [Endeavor Data Center](https://dchub.cloud/facilities/systemmetrics-endeavor-data-center-a7b1d0b2) | SystemMetrics | Operational |  |
| [Servpac Puahale DC](https://dchub.cloud/facilities/servpac-inc-puahale-56af385b) | Servpac Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Hawaii](https://dchub.cloud/facilities/in/us/hawaii).

## More on Honolulu

- [Honolulu DCPI score](https://dchub.cloud/dcpi/honolulu)
- [Honolulu market brief](https://dchub.cloud/markets/honolulu/brief)
- [Hawaii data center market brief](https://dchub.cloud/states/hawaii/brief)
- [Hawaii data center tax incentives](https://dchub.cloud/states/hawaii/data-center-incentives)

### Email me when the Honolulu DCPI verdict changes

Email me when Honolulu's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Honolulu market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=honolulu) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=honolulu)

JSON: [/api/v1/markets/honolulu/deep-dive](https://dchub.cloud/api/v1/markets/honolulu/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Honolulu","item":"https://dchub.cloud/markets/honolulu"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Honolulu Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:02:06.497010+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/honolulu",
 "wordCount":233,
 "about":{"@type":"Place","name":"Honolulu"},
 "description":"Live data-center market analysis. DCPI score 24.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "honolulu", "name": "Honolulu Data Center Market — DC Hub", "description": "Live data-center market measurements for Honolulu, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/honolulu", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Honolulu"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:13."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:13.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:13."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/honolulu#webpage", "url": "https://dchub.cloud/markets/honolulu", "name": "Honolulu data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Honolulu data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Honolulu market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Honolulu data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Honolulu market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
