---
description: Is Hong Kong a good data center market for power? DCPI verdict AVOID, score 24.1/100 (CLP), as of 2026-11-12. 172 MW tracked across all listings, unverified included (as of 2026-11-11). Grid, queue and deal context for 300+ markets.
title: "Hong Kong data centers: power, grid and capacity | DC Hub"
---

# Hong Kong data center market

Power availability in Hong Kong: DCPI verdict AVOID, composite score 24.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 188 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Hong Kong data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Hong Kong market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.1/100**

MW, all listings**172**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Hong Kong at a glance

Hong Kong has 172 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (120 MW), GDS (30 MW) and NTT (22 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 172 |
| Total listed | 172 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Hong Kong

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE Global Data Center Trends 2026 (Q1 2026): (figure on paid plans) in Q1 2026, up from (figure on paid plans) a year earlier [(link)](https://www.cbre.com/insights/reports/global-data-center-trends-2026)

This assessment reflects structural difficulty in securing additional grid capacity or alternative power supply sufficient to support new facility development or expansion.

Deal flow remains modest but active. Amazon's $312M acquisition represents the only completed transaction in the tracked set; the Goodman investment commitment ($455M announced) and a second unnamed Amazon acquisition remain in announcement or negotiation phases, their completion status unconfirmed.

## Data centers in Hong Kong

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Equinix HK Campus](https://dchub.cloud/facilities/equinix-equinix-hk-campus-dc3a425e) | Equinix | Operational | 50 |
| [Equinix HK5](https://dchub.cloud/facilities/equinix-equinix-hk5-0c4cebc3) | Equinix | Operational | 40 |
| [Equinix HK2](https://dchub.cloud/facilities/equinix-equinix-hk2-df6f6629) | Equinix | Operational | 30 |
| [GDS Hong Kong 1](https://dchub.cloud/facilities/gds-gds-hong-kong-1-0ad9da16) | GDS | Operational | 30 |
| [NTT Hong Kong 1](https://dchub.cloud/facilities/ntt-ntt-hong-kong-1-df1128d6) | NTT | Operational | 22 |
| [AWS AP East 1 (Hong Kong)](https://dchub.cloud/facilities/amazon-web-services-aws-ap-east-1-hong-kong-fa8cf0fc) | Amazon Web Services | Operational |  |
| [AirTrunk HKG1](https://dchub.cloud/facilities/airtrunk-operating-pty-ltd-airtrunk-hkg1-9ee2161e) | AirTrunk Operating Pty Ltd | Operational |  |
| [Asia Tone Hongkong (DC1)](https://dchub.cloud/facilities/asia-tone-asia-tone-hongkong-dc1-bc80c6f9) | Asia Tone | Operational |  |
| [Azure East Asia Hong Kong](https://dchub.cloud/facilities/microsoft-azure-east-asia-hong-kong-907fbc7e) | Microsoft | Operational |  |
| [CUHK](https://dchub.cloud/facilities/chinese-university-of-hong-kong-cuhk-4116e6cf) | Chinese University of Hong Kong | Operational |  |
| [China Mobile International - GNC Hong Kong](https://dchub.cloud/facilities/china-mobile-international-limited-china-mobile-international-gnc-hong-kong-8b1672a6) | China Mobile International Limited | Operational |  |
| [Digital Realty Hong Kong HKG10](https://dchub.cloud/facilities/digital-realty-digital-realty-hong-kong-hkg10-d9cb5fc5) | Digital Realty | Operational |  |
| [Equinix HK6 - Hong Kong](https://dchub.cloud/facilities/equinix-inc-equinix-hk6-hong-kong-de0ce49c) | Equinix, Inc. | Operational |  |
| [GDS Hong Kong HK1](https://dchub.cloud/facilities/gds-gds-hong-kong-hk1-5c53be04) | GDS | Operational |  |
| [Global Switch Hong Kong](https://dchub.cloud/facilities/global-switch-global-switch-hong-kong-2f963430) | Global Switch | Operational |  |
| [Google Cloud asia-east2 Hong Kong](https://dchub.cloud/facilities/google-google-cloud-asia-east2-hong-kong-976dac31) | Google | Operational |  |
| [IXTech Limited](https://dchub.cloud/facilities/ixtech-limited-ixtech-limited-ce10c015) |  | Operational |  |
| [JUMBO (iAdvantage Hong Kong)](https://dchub.cloud/facilities/iadvantage-hong-kong-jumbo-iadvantage-hong-kong-c0977e2a) | iAdvantage Hong Kong | Operational |  |
| [Leaseweb Hong Kong HK](https://dchub.cloud/facilities/leaseweb-leaseweb-hong-kong-hk-ba687839) | Leaseweb | Operational |  |
| [MCX10](https://dchub.cloud/facilities/pccw-mcx10-6e32a371) | PCCW | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Hong Kong](https://dchub.cloud/facilities/in/hk).

## More on Hong Kong

- [Hong Kong DCPI score](https://dchub.cloud/dcpi/hong-kong)
- [Hong Kong market brief](https://dchub.cloud/markets/hong-kong/brief)

### Email me when the Hong Kong DCPI verdict changes

Email me when Hong Kong's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Hong Kong: 172 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=hong-kong) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=hong-kong)

JSON: [/api/v1/markets/hong-kong/deep-dive](https://dchub.cloud/api/v1/markets/hong-kong/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Hong Kong","item":"https://dchub.cloud/markets/hong-kong"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Hong Kong Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T05:24:40.572096+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/hong-kong",
 "wordCount":188,
 "about":{"@type":"Place","name":"Hong Kong"},
 "description":"Live data-center market analysis. DCPI score 24.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "hong-kong", "name": "Hong Kong Data Center Market — DC Hub", "description": "Live data-center market measurements for Hong Kong, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/hong-kong", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Hong Kong"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 172.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:02."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:02.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:02."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/hong-kong#webpage", "url": "https://dchub.cloud/markets/hong-kong", "name": "Hong Kong data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Hong Kong data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Hong Kong market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Hong Kong data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Hong Kong market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
