---
description: Is Ho Chi Minh City a good data center market for power? DCPI verdict AVOID, score 22.1/100 (EVN), as of 2026-11-12. 52 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Ho Chi Minh City data centers: power, grid and capacity | DC Hub"
---

# Ho Chi Minh City data center market

Power availability in Ho Chi Minh City: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 243 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Ho Chi Minh City data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Ho Chi Minh City market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.1/100**

MW, all listings**52**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Ho Chi Minh City

DC Hub does not hold a lease-rate figure for this market yet.

Only one tracked facility in the market publicly reports megawatt capacity. The operator base remains concentrated among a small number of incumbents with no recent deal activity recorded.

Together, these readings suggest that securing incremental power supply for expansion—whether through grid connection, dedicated generation, or power purchase agreements—will face material obstacles.

Evolution DC has secured a long-term land lease in Saigon Hi-Tech Park and is planning a 52 MW data center on the site. Separately, VNG is moving to acquire STT GDC's stake in a Ho Chi Minh City joint venture following STT GDC's withdrawal from the planned project. These activities reflect ongoing interest in capacity development despite the tight power environment.

## Data centers in Ho Chi Minh City

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [STTGDC VNG HCMC1](https://dchub.cloud/facilities/st-telemedia-global-data-centres-stt-gdc-stt-vng-ho-chi-minh-city-1-c80d62ca) | ST Telemedia Global Data Centres (STT GDC) | Operational |  |
| [Tòa nhà VNPT IDC Tân Thuận](https://dchub.cloud/facilities/vnpt-ta-nh-vnpt-idc-tn-thun-04b986e8) | VNPT | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Vietnam](https://dchub.cloud/facilities/in/vn).

## More on Ho Chi Minh City

- [Ho Chi Minh City DCPI score](https://dchub.cloud/dcpi/ho-chi-minh-city)
- [Ho Chi Minh City market brief](https://dchub.cloud/markets/ho-chi-minh-city/brief)

### Email me when the Ho Chi Minh City DCPI verdict changes

Email me when Ho Chi Minh City's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Ho Chi Minh City: 52 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=ho-chi-minh-city) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=ho-chi-minh-city)

JSON: [/api/v1/markets/ho-chi-minh-city/deep-dive](https://dchub.cloud/api/v1/markets/ho-chi-minh-city/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Ho Chi Minh City","item":"https://dchub.cloud/markets/ho-chi-minh-city"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Ho Chi Minh City Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:01:59.242159+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/ho-chi-minh-city",
 "wordCount":243,
 "about":{"@type":"Place","name":"Ho Chi Minh City"},
 "description":"Live data-center market analysis. DCPI score 22.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "ho-chi-minh-city", "name": "Ho Chi Minh City Data Center Market — DC Hub", "description": "Live data-center market measurements for Ho Chi Minh City, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/ho-chi-minh-city", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Ho Chi Minh City"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 52.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:05."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:05.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:05."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/ho-chi-minh-city#webpage", "url": "https://dchub.cloud/markets/ho-chi-minh-city", "name": "Ho Chi Minh City data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Ho Chi Minh City data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Ho Chi Minh City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Ho Chi Minh City data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Ho Chi Minh City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
