# Herndon data center market

Power availability in Herndon: DCPI verdict AVOID, composite score 21.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 222 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Herndon data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Herndon market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Herndon

DC Hub does not hold a lease-rate figure for this market yet.

The market shows no recent deal activity in the tracked dataset. Operator concentration remains high, with the top two players controlling the majority of identified footprint across the region.

The DCPI verdict of AVOID reflects structural power-supply headwinds. Together, these metrics suggest that incremental power supply will be difficult and costly to secure in Herndon's current infrastructure environment.

Deal flow has stalled. No recent transactions appear in the tracked dataset, leaving operator dynamics frozen at current positions. AWS maintains a 6-site presence, while Equinix operates 3 identified facilities including DC 97. Without new leasing or M&A activity, competitive positioning and capacity expansion plans remain opaque.

## Data centers in Herndon

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cogent Herndon](https://dchub.cloud/facilities/cogent-communications-inc-cogent-herndon-c0ea7c16) | Cogent Communications, Inc. | Operational |  |
| [Level(3) Herndon](https://dchub.cloud/facilities/lumen-technologies-level3-herndon-182a84ee) | Lumen Technologies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Herndon

- [Herndon DCPI score](https://dchub.cloud/dcpi/herndon)
- [Herndon market brief](https://dchub.cloud/markets/herndon/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Herndon DCPI verdict changes

Email me when Herndon's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Herndon market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=herndon) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=herndon)

JSON: [/api/v1/markets/herndon/deep-dive](https://dchub.cloud/api/v1/markets/herndon/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Herndon","item":"https://dchub.cloud/markets/herndon"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Herndon Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:01:43.057638+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/herndon",
 "wordCount":222,
 "about":{"@type":"Place","name":"Herndon"},
 "description":"Live data-center market analysis. DCPI score 21.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "herndon", "name": "Herndon Data Center Market — DC Hub", "description": "Live data-center market measurements for Herndon, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/herndon", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Herndon"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:55."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:55.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:55."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/herndon#webpage", "url": "https://dchub.cloud/markets/herndon", "name": "Herndon data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Herndon data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Herndon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Herndon data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Herndon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```