description: Is Henderson a good data center market for power? DCPI verdict CAUTION, score 49.5/100 (WECC), as of 2026-11-12. 266 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Henderson data centers: power, grid and capacity | DC Hub"
---

# Henderson data center market

Power availability in Henderson: DCPI verdict CAUTION, composite score 49.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 248 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Henderson data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Henderson market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.5/100**

MW, all listings**266**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Henderson at a glance

Henderson has 200 MW operational and 66 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (266 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 200 |
| Under construction | 66 |
| Total listed | 266 |

## Developers building or planning in Henderson

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Google | 66 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Henderson

DC Hub does not hold a lease-rate figure for this market yet.

Henderson's tracked footprint spans 266 MW across six facilities, with Google operating four sites and JASMINE DEVELOPMENT, LLC managing one, though no recent deal activity has been recorded in this market. The region currently hosts a mix of operational, under-construction, and planned capacity, reflecting ongoing infrastructure development in Nevada's data center corridor. Recent regional reporting indicates developer activity around power infrastructure alternatives, including natural gas plant proposals on BLM land adjacent to hyperscale data center sites.

This configuration signals that while the market has demonstrated power surplus relative to current demand, infrastructure bottlenecks exist that will complicate procurement of incremental capacity. Site developers and operators should expect interconnection timelines and transmission availability to be material factors in project planning, even as raw megawatt supply remains available.

Google's dominant operator footprint—four of six tracked facilities—establishes significant scale concentration in Henderson. The single independent operator presence suggests limited competitive density within the tracked asset base. No recent deals have been recorded, meaning there are no announced acquisitions, sales, or new capacity commitments to signal near-term operator appetite or consolidation activity.

## Data centers in Henderson

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Henderson Data Center](https://dchub.cloud/facilities/google-google-henderson-data-center-bf777332) | Google | Operational | 200 |
| [Google Henderson Building 3](https://dchub.cloud/facilities/google-google-henderson-building-3-86d6cd6f) | Google | Under Construction | 66 |
| [Google Cloud us-west4 Las Vegas](https://dchub.cloud/facilities/google-google-cloud-us-west4-las-vegas-cb233771) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Nevada](https://dchub.cloud/facilities/in/us/nevada).

## More on Henderson

- [Henderson DCPI score](https://dchub.cloud/dcpi/henderson)
- [Henderson market brief](https://dchub.cloud/markets/henderson/brief)
- [Nevada data center market brief](https://dchub.cloud/states/nevada/brief)
- [Nevada data center tax incentives](https://dchub.cloud/states/nevada/data-center-incentives)

### Email me when the Henderson DCPI verdict changes

Email me when Henderson's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Henderson: 266 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=henderson) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=henderson)

JSON: [/api/v1/markets/henderson/deep-dive](https://dchub.cloud/api/v1/markets/henderson/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Henderson","item":"https://dchub.cloud/markets/henderson"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Henderson Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:01:26.370044+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/henderson",
 "wordCount":248,
 "about":{"@type":"Place","name":"Henderson"},
 "description":"Live data-center market analysis. DCPI score 49.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "henderson", "name": "Henderson Data Center Market — DC Hub", "description": "Live data-center market measurements for Henderson, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/henderson", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Henderson"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 266.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:56."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:56.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:56."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/henderson#webpage", "url": "https://dchub.cloud/markets/henderson", "name": "Henderson data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Henderson data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Henderson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Henderson data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Henderson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```