# Helsinki data center market

Power availability in Helsinki: DCPI verdict AVOID, composite score 30.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 267 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Helsinki data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Helsinki market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.3/100**

MW, all listings**600**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Helsinki at a glance

Helsinki has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 40 |
| Total listed | 40 |

## Developers building or planning in Helsinki

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Microsoft | 40 |  |
| Amazon Web Services |  |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Helsinki

DC Hub does not hold a lease-rate figure for this market yet.

Equinix operates the largest footprint with seven sites, followed by Telia Company with three and Microsoft with two. The OnZero joint venture was announced, though deal terms remain undisclosed.

The DCPI verdict of AVOID reflects structural tension in Helsinki's power supply dynamics. This combination—low headroom paired with moderate-to-high friction—creates a challenging environment for operators planning incremental power additions. Existing operators will face longer lead times and higher coordination complexity when seeking new or expanded power allocations from the local grid.

Deal activity remains thin relative to market size. The OnZero joint venture represents the only recent tracked transaction, suggesting measured M&A velocity in the Helsinki operator base. Equinix's seven-site presence and Telia Company's three-site footprint indicate consolidation around established regional players with existing grid relationships and infrastructure leverage. Microsoft's two tracked facilities reflect selective presence by hyperscale builders rather than aggressive expansion. The absence of major recent acquisition or greenfield announcements in Helsinki proper contrasts with accelerating activity elsewhere in Finland—notably Heim's undisclosed investment round announced in October 2026 and multiple Lapland-based renewable energy projects targeting data center development at substantially larger scales.

## Data centers in Helsinki

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Espoo Finland](https://dchub.cloud/facilities/microsoft-microsoft-espoo-finland-b1813ab8) | Microsoft | Under Construction | 40 |
| [AWS Europe (Finland)](https://dchub.cloud/facilities/amazon-web-services-aws-europe-finland-d35f5200) | Amazon Web Services | Planned |  |
| [DNA Lauttasaari](https://dchub.cloud/facilities/dna-oyj-dna-lauttasaari-db0b9942) | DNA Oyj | Operational |  |
| [Digita Helsinki Pasila Broadcasting Tower](https://dchub.cloud/facilities/digita-oy-digita-helsinki-pasila-broadcasting-tower-8fed6f51) | Digita Oy | Operational |  |
| [Elisa Helsinki Lauttasaari](https://dchub.cloud/facilities/elisa-oyj-elisa-helsinki-lauttasaari-54ff8c5b) | Elisa Oyj | Operational |  |
| [Equinix HE5 - Helsinki, Viikinmäki](https://dchub.cloud/facilities/equinix-equinix-he5-helsinki-viikinmki-b5132430) | Equinix | Operational |  |
| [Hetzner Helsinki DC](https://dchub.cloud/facilities/hetzner-hetzner-helsinki-dc-0bb11161) | Hetzner | Operational |  |
| [LocalNet Lauttasaari (Nebula)](https://dchub.cloud/facilities/telia-company-nebula-oy-lauttasaari-08a6d94f) | Telia Company | Operational |  |
| [Microsoft Azure Finland South](https://dchub.cloud/facilities/microsoft-microsoft-azure-finland-south-27df67e6) | Microsoft | Planned |  |
| [Telia Espoo Data Center](https://dchub.cloud/facilities/telia-telia-espoo-data-center-120b43e7) | Telia | Operational |  |
| [Telia HDC](https://dchub.cloud/facilities/telia-finland-oyj-telia-hdc-e85d8c3e) | Telia Finland Oyj | Operational |  |
| [Telia Helsinki Datacenter](https://dchub.cloud/facilities/telia-company-telia-helsinki-datacenter-8377164e) | Telia Company | Operational |  |
| [Verne Global HELSINKI](https://dchub.cloud/facilities/verne-global-verne-global-helsinki-090c7c2f) | Verne Global | Operational |  |
| [atNorth FIN01](https://dchub.cloud/facilities/atnorth-atnorth-fin01-9659df1f) | atNorth | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Finland](https://dchub.cloud/facilities/in/fi).

## More on Helsinki

- [Helsinki DCPI score](https://dchub.cloud/dcpi/helsinki)
- [Helsinki market brief](https://dchub.cloud/markets/helsinki/brief)

### Email me when the Helsinki DCPI verdict changes

Email me when Helsinki's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Helsinki: 600 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=helsinki) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=helsinki)

JSON: [/api/v1/markets/helsinki/deep-dive](https://dchub.cloud/api/v1/markets/helsinki/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Helsinki","item":"https://dchub.cloud/markets/helsinki"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Helsinki Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:01:18.043197+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/helsinki",
 "wordCount":267,
 "about":{"@type":"Place","name":"Helsinki"},
 "description":"Live data-center market analysis. DCPI score 30.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "helsinki", "name": "Helsinki Data Center Market — DC Hub", "description": "Live data-center market measurements for Helsinki, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/helsinki", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Helsinki"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 600.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:50."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:50.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:50."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/helsinki#webpage", "url": "https://dchub.cloud/markets/helsinki", "name": "Helsinki data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Helsinki data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Helsinki market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Helsinki data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Helsinki market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```