---
description: Is Hammond a good data center market for power? DCPI verdict CAUTION, score 43.2/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Hammond data centers: power, grid and capacity | DC Hub"
---

# Hammond data center market

Power availability in Hammond: DCPI verdict CAUTION, composite score 43.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 268 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Hammond data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Hammond market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**43.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Hammond

DC Hub does not hold a lease-rate figure for this market yet.

The market shows fragmentation across a small operator base with limited transparency—only one tracked site currently reports megawatt capacity to the market. This concentration among two operators and the absence of publicly reported aggregate capacity figures suggest a nascent or intentionally opaque market structure typical of secondary Indiana corridors.

Together, these scores suggest that Hammond can accommodate incremental power draw, but operators pursuing greenfield or major expansion projects should expect non-trivial engineering and infrastructure coordination with local utilities. Power availability is present but tight.

No recent deals have been tracked in Hammond, a notable void given broader industry momentum. Kansas City and Indianapolis markets, despite their own deal sparseness, show operator interest in regional Indiana and Midwest expansion through land acquisition and greenfield signaling. Hammond's deal silence does not necessarily indicate lack of operator interest, but rather that any transactions—if occurring—remain untracked or are structured outside conventional capital event reporting.

## Data centers in Hammond

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Crossroad DX-1](https://dchub.cloud/facilities/digital-crossroad-digital-crossroad-dx-1-8dde8a84) | Digital Crossroad | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Indiana](https://dchub.cloud/facilities/in/us/indiana).

## More on Hammond

- [Hammond DCPI score](https://dchub.cloud/dcpi/hammond)
- [Hammond market brief](https://dchub.cloud/markets/hammond/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Hammond DCPI verdict changes

Email me when Hammond's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Hammond market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=hammond) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=hammond)

JSON: [/api/v1/markets/hammond/deep-dive](https://dchub.cloud/api/v1/markets/hammond/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Hammond","item":"https://dchub.cloud/markets/hammond"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Hammond Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T09:02:09.089860+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/hammond",
 "wordCount":268,
 "about":{"@type":"Place","name":"Hammond"},
 "description":"Live data-center market analysis. DCPI score 43.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "hammond", "name": "Hammond Data Center Market — DC Hub", "description": "Live data-center market measurements for Hammond, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/hammond", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Hammond"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 43.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:57."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:57.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:57."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/hammond#webpage", "url": "https://dchub.cloud/markets/hammond", "name": "Hammond data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Hammond data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Hammond market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Hammond data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Hammond market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
