# Greenville data center market

Power availability in Greenville: DCPI verdict AVOID, composite score 29.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 210 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Greenville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Greenville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**29.2/100**

MW, all listings**10**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Greenville at a glance

Greenville has 10 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DC BLOX (10 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 10 |
| Total listed | 10 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Greenville

DC Hub does not hold a lease-rate figure for this market yet.

Greenville's tracked data center footprint comprises four facilities operated by DC BLOX and DartPoints, with only one site publicly reporting generation or consumption metrics. The market lacks density benchmarks due to incomplete capacity disclosure, limiting visibility into total demand or reserve margins. Operator presence is split evenly between two platform companies, each holding two facilities.

Power procurement in Greenville faces material headwinds. Together, these metrics reflect a market where securing new power allocations will encounter both supply scarcity and infrastructure bottlenecks. Regional context underscores this pattern: utility power procurement delays have disrupted data center projects across South Carolina, as evidenced by development withdrawals in adjacent markets.

Deal flow has stalled. No recent transactions have been tracked in Greenville, and the operator roster shows no evidence of consolidation or new entrant activity. The four tracked facilities remain split between DC BLOX (one facility) and DartPoints (one facility), alongside their respective parent entities.

## Data centers in Greenville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DC BLOX Greenville](https://dchub.cloud/facilities/dc-blox-dc-blox-greenville-47bad63a) | DC BLOX | Operational | 10 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [South Carolina](https://dchub.cloud/facilities/in/us/south-carolina).

## More on Greenville

- [Greenville DCPI score](https://dchub.cloud/dcpi/greenville)
- [Greenville market brief](https://dchub.cloud/markets/greenville/brief)
- [South Carolina data center market brief](https://dchub.cloud/states/south-carolina/brief)
- [South Carolina data center tax incentives](https://dchub.cloud/states/south-carolina/data-center-incentives)

### Email me when the Greenville DCPI verdict changes

Email me when Greenville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Greenville: 10 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=greenville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=greenville)

JSON: [/api/v1/markets/greenville/deep-dive](https://dchub.cloud/api/v1/markets/greenville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Greenville","item":"https://dchub.cloud/markets/greenville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Greenville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T05:26:12.844183+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/greenville",
 "wordCount":210,
 "about":{"@type":"Place","name":"Greenville"},
 "description":"Live data-center market analysis. DCPI score 29.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "greenville", "name": "Greenville Data Center Market — DC Hub", "description": "Live data-center market measurements for Greenville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/greenville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Greenville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 10.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 29.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:28."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:28.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:28."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/greenville#webpage", "url": "https://dchub.cloud/markets/greenville", "name": "Greenville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Greenville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Greenville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Greenville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Greenville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```