---
description: Is Grand Rapids a good data center market for power? DCPI verdict CAUTION, score 45.9/100 (MISO), as of 2026-11-12. 130 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Grand Rapids data centers: power, grid and capacity | DC Hub"
---

# Grand Rapids data center market

Power availability in Grand Rapids: DCPI verdict CAUTION, composite score 45.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 262 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Grand Rapids data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Grand Rapids market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.9/100**

MW, all listings**130**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 45.8. The index is recomputed through the day and reads 45.9 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Grand Rapids at a glance

Grand Rapids has 10 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are US Signal (10 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 10 |
| Total listed | 10 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Grand Rapids

DC Hub does not hold a lease-rate figure for this market yet.

The dual metric reflects a market where generation exists but infrastructure bottlenecks are beginning to bite.

New power procurement here will face friction—not gridlock, but meaningful obstacles.

No recent deals are tracked in Grand Rapids. The operator base is fragmented: US Signal holds two sites, Switch operates two, and Involta, MI GRR LLC, and Iserv Grand Rapids each operate one. This ownership structure means no single player dominates—a condition that typically supports transactional activity, yet none is recorded.

Operators planning capacity additions or new site development should model for extended power interconnection timelines and engage grid operators and municipal stakeholders early.

## Data centers in Grand Rapids

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [US Signal Grand Rapids](https://dchub.cloud/facilities/us-signal-us-signal-grand-rapids-39e22159) | US Signal | Operational | 10 |
| [Switch The Keep Grand Rapids](https://dchub.cloud/facilities/switch-switch-the-keep-grand-rapids-e717a3aa) | Switch | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Michigan](https://dchub.cloud/facilities/in/us/michigan).

## More on Grand Rapids

- [Grand Rapids DCPI score](https://dchub.cloud/dcpi/grand-rapids)
- [Grand Rapids market brief](https://dchub.cloud/markets/grand-rapids/brief)
- [Michigan data center market brief](https://dchub.cloud/states/michigan/brief)
- [Michigan data center tax incentives](https://dchub.cloud/states/michigan/data-center-incentives)

### Email me when the Grand Rapids DCPI verdict changes

Email me when Grand Rapids's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Grand Rapids: 130 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=grand-rapids) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=grand-rapids)

JSON: [/api/v1/markets/grand-rapids/deep-dive](https://dchub.cloud/api/v1/markets/grand-rapids/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Grand Rapids","item":"https://dchub.cloud/markets/grand-rapids"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Grand Rapids Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T05:26:05.947930+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/grand-rapids",
 "wordCount":262,
 "about":{"@type":"Place","name":"Grand Rapids"},
 "description":"Live data-center market analysis. DCPI score 45.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "grand-rapids", "name": "Grand Rapids Data Center Market — DC Hub", "description": "Live data-center market measurements for Grand Rapids, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/grand-rapids", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Grand Rapids"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 130.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:10."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/grand-rapids#webpage", "url": "https://dchub.cloud/markets/grand-rapids", "name": "Grand Rapids data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Grand Rapids data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Grand Rapids market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Grand Rapids data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Grand Rapids market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
