Power availability in Goose Creek: DCPI verdict AVOID, composite score 28.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 191 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Goose Creek data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Goose Creek market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**28.6/100**

MW, all listings**200**every tracked site reports MWany status, unverified listings included

Verdict**AVOID**

## Goose Creek at a glance

Goose Creek has 200 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (200 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 200 |
| Total listed | 200 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Goose Creek

DC Hub does not hold a lease-rate figure for this market yet.

Goose Creek's data center footprint is minimal and opaque. One tracked facility operates in the market; its operator is Google. Beyond this single site, visibility into capacity, headcount, or infrastructure density remains limited. The market shows no recent deal activity on record.

The DCPI verdict of AVOID reflects a precarious power position. Together, these readings indicate that sourcing new power here will require longer lead times, higher interconnection costs, or both. This is not a statement about market desirability but a direct measure of grid access friction.

Deal flow is absent. No transactions have been tracked in Goose Creek in the current window. The single operator presence—Google—provides no read on competitive dynamics or consolidation appetite.

New entrants or expansions should model extended utility coordination windows into site economics.

## Data centers in Goose Creek

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Berkeley County Data Center](https://dchub.cloud/facilities/google-google-berkeley-county-data-center-eb66d3d5) | Google | Operational | 200 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [South Carolina](https://dchub.cloud/facilities/in/us/south-carolina).

## More on Goose Creek

- [Goose Creek DCPI score](https://dchub.cloud/dcpi/goose-creek)
- [Goose Creek market brief](https://dchub.cloud/markets/goose-creek/brief)
- [South Carolina data center market brief](https://dchub.cloud/states/south-carolina/brief)
- [South Carolina data center tax incentives](https://dchub.cloud/states/south-carolina/data-center-incentives)

### Email me when the Goose Creek DCPI verdict changes

Email me when Goose Creek's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Goose Creek: 200 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=goose-creek) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=goose-creek)

JSON: [/api/v1/markets/goose-creek/deep-dive](https://dchub.cloud/api/v1/markets/goose-creek/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Goose Creek","item":"https://dchub.cloud/markets/goose-creek"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Goose Creek Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T05:25:56.750519+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/goose-creek",
 "wordCount":191,
 "about":{"@type":"Place","name":"Goose Creek"},
 "description":"Live data-center market analysis. DCPI score 28.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "goose-creek", "name": "Goose Creek Data Center Market — DC Hub", "description": "Live data-center market measurements for Goose Creek, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/goose-creek", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Goose Creek"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 200.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 28.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:44."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:44.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:44."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/goose-creek#webpage", "url": "https://dchub.cloud/markets/goose-creek", "name": "Goose Creek data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Goose Creek data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Goose Creek market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Goose Creek data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Goose Creek market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```