description: Is Goodyear a good data center market for power? DCPI verdict BUILD, score 67.7/100 (WECC), as of 2026-11-12. 1,260 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Goodyear data centers: power, grid and capacity | DC Hub"
---

# Goodyear data center market

Power availability in Goodyear: DCPI verdict BUILD, composite score 67.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 250 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Goodyear data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Goodyear market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**67.7/100**

MW, all listings**1,260**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Goodyear at a glance

Goodyear has 454 MW operational and 212 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (304 MW), Compass Datacenters (212 MW) and Microsoft (150 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 454 |
| Under construction | 212 |
| Total listed | 666 |

## Developers building or planning in Goodyear

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 212 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Goodyear

DC Hub does not hold a lease-rate figure for this market yet.

Three operators—Microsoft, Vantage (6), and Vantage Data Centers (5)—dominate the deployed and pipeline base.

The DCPI verdict of BUILD reflects favorable conditions for new power provisioning. This combination suggests the market can absorb greenfield power development without severe interconnection delays or costly backbone upgrades. New facilities entering Goodyear will encounter neither acute scarcity nor abundant spare capacity—the profile supports incremental build activity without requiring major grid reinforcement ahead of operations.

Deal flow in Goodyear remains inactive on the tracked record, with no recent acquisitions or asset transfers logged. Operator concentration remains high; the three leading entities control two-thirds of the tracked base. This static deal environment reflects either equilibrium in the current footprint or a lull between transaction windows. Vantage's multi-entity presence (operating both under the Vantage and Vantage Data Centers banners) underscores how single operators structure multiple legal entities across a single geography. The absence of recent deal activity does not signal market weakness—it indicates operators are provisioning capacity through organic growth rather than M&A.

Goodyear's power and supply dynamics remain oriented toward new-build deployment over the near term.

## Data centers in Goodyear

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Compass Goodyear Campus (Phoenix)](https://dchub.cloud/facilities/compass-datacenters-compass-goodyear-campus-phoenix-dc9da94a) | Compass Datacenters | Under Construction | 212 |
| [Vantage Phoenix Campus](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-campus-a4f2d978) | Vantage Data Centers | Operational | 200 |
| [Microsoft West Region](https://dchub.cloud/facilities/microsoft-microsoft-west-region-c68876c8) | Microsoft | Operational | 150 |
| [Vantage Phoenix V1](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-v1-db9eff19) | Vantage Data Centers | Operational | 56 |
| [Vantage Phoenix V2](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-v2-8bbe1376) | Vantage Data Centers | Operational | 48 |
| [PHX-10](https://dchub.cloud/facilities/microsoft-phx-10-b5991ea3) | Microsoft | Operational |  |
| [PHX-12](https://dchub.cloud/facilities/microsoft-phx-12-3bd87319) | Microsoft | Operational |  |
| [PHX-13](https://dchub.cloud/facilities/microsoft-phx-13-248d7080) | Microsoft | Operational |  |
| [PHX-14](https://dchub.cloud/facilities/microsoft-phx-14-c48078fe) | Microsoft | Operational |  |
| [Stream Data Centers - Phoenix I](https://dchub.cloud/facilities/stream-data-centers-stream-data-centers-phoenix-i-9c660d66) | Stream Data Centers | Operational |  |
| [Stream Data Centers PHX-1](https://dchub.cloud/facilities/stream-data-centers-phx-1-d5c0b3dd) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Goodyear

- [Goodyear DCPI score](https://dchub.cloud/dcpi/goodyear)
- [Goodyear market brief](https://dchub.cloud/markets/goodyear/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Goodyear DCPI verdict changes

Email me when Goodyear's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Goodyear: 1,260 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=goodyear) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=goodyear)

JSON: [/api/v1/markets/goodyear/deep-dive](https://dchub.cloud/api/v1/markets/goodyear/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Goodyear","item":"https://dchub.cloud/markets/goodyear"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Goodyear Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T05:25:48.435303+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/goodyear",
 "wordCount":250,
 "about":{"@type":"Place","name":"Goodyear"},
 "description":"Live data-center market analysis. DCPI score 67.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "goodyear", "name": "Goodyear Data Center Market — DC Hub", "description": "Live data-center market measurements for Goodyear, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/goodyear", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Goodyear"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1260.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 67.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:56."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:56.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:56."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/goodyear#webpage", "url": "https://dchub.cloud/markets/goodyear", "name": "Goodyear data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Goodyear data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Goodyear market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Goodyear data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Goodyear market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```