---
description: Is Garland a good data center market for power? DCPI verdict CAUTION, score 45.5/100 (ERCOT), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Garland data centers: power, grid and capacity | DC Hub"
---

# Garland data center market

Power availability in Garland: DCPI verdict CAUTION, composite score 45.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 291 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Garland data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Garland market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Garland

DC Hub does not hold a lease-rate figure for this market yet.

Deal flow remains dormant in Garland's tracked record, a pattern that mirrors broader dormancy reported across Dallas–Fort Worth proper. Within Texas more broadly, acquisition and development activity continues at larger scales: regional operators have announced substantial capacity plays, including a 110-acre campus expansion near Dallas and a 500-acre campus acquisition in McGregor, alongside longer-term commitments to build new infrastructure.

## Data centers in Garland

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [RagingWire TX1 - NTT](https://dchub.cloud/facilities/ragingwire-data-centers-ragingwire-tx1-ntt-26fb9de3) | RagingWire Data Centers | Operational |  |
| [Stream Data Centers](https://dchub.cloud/facilities/stream-data-centers-f9bcab8d) |  | Operational |  |
| [Stream Data Centers - DFW VII](https://dchub.cloud/facilities/stream-data-centers-stream-data-centers-dfw-vii-adb44d93) | Stream Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Garland

- [Garland DCPI score](https://dchub.cloud/dcpi/garland)
- [Garland market brief](https://dchub.cloud/markets/garland/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Garland DCPI verdict changes

Email me when Garland's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Garland market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=garland) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=garland)

JSON: [/api/v1/markets/garland/deep-dive](https://dchub.cloud/api/v1/markets/garland/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Garland","item":"https://dchub.cloud/markets/garland"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Garland Data Center Market Deep-Dive",
 "datePublished":"2026-11-06T09:55:39.770201+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/garland",
 "wordCount":291,
 "about":{"@type":"Place","name":"Garland"},
 "description":"Live data-center market analysis. DCPI score 45.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "garland", "name": "Garland Data Center Market — DC Hub", "description": "Live data-center market measurements for Garland, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/garland", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Garland"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:58."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:58.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:58."}], "dateModified": "2026-11-06", "temporalCoverage": "2026-11-06"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/garland#webpage", "url": "https://dchub.cloud/markets/garland", "name": "Garland data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Garland data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Garland market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Garland data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Garland market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
