---
description: Is Garden City a good data center market for power? DCPI verdict CAUTION, score 49.4/100 (NYISO), as of 2026-11-12. 200 MW tracked across all listings, unverified included (as of 2026-11-06). Grid, queue and deal context for 300+ markets.
title: "Garden City data centers: power, grid and capacity | DC Hub"
---

# Garden City data center market

Power availability in Garden City: DCPI verdict CAUTION, composite score 49.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 244 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Garden City data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Garden City market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.4/100**

MW, all listings**200**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## Garden City at a glance

Garden City has 100 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Applied Digital (200 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 100 |
| Under construction | 100 |
| Total listed | 200 |

## Developers building or planning in Garden City

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Applied Digital | 100 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Garden City

DC Hub does not hold a lease-rate figure for this market yet.

Applied Digital operates two sites in the market, with a third facility at 1101 Stewart Ave and Webair holding a fourth location. The operator base remains concentrated, with no recent deal activity recorded in the market through the tracking period.

This combination suggests that while raw power may exist in the region, the pathway to activating it carries elevated execution risk and likely extended timelines for new projects seeking to come online.

No recent deals have been tracked in Garden City, leaving operator composition stable but fragmented. Applied Digital's dual-site presence establishes it as the market anchor, though the single-facility operators—Webair and the 1101 Stewart Ave entity—maintain meaningful stakes. The absence of M&A or capacity transactions over the analyzed period indicates neither consolidation pressure nor acquisition competition has reshaped the market's ownership structure. Broader sector activity, including large-scale platform acquisitions and strategic facility development elsewhere, has not translated into recorded transaction flow in Garden City specifically.

## Data centers in Garden City

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Applied Digital Garden City](https://dchub.cloud/facilities/applied-digital-applied-digital-garden-city-e6115cea) | Applied Digital | Operational | 100 |
| [Applied Digital Garden City KS](https://dchub.cloud/facilities/applied-digital-applied-digital-garden-city-ks-227deac2) | Applied Digital | Under Construction | 100 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Kansas](https://dchub.cloud/facilities/in/us/kansas).

## More on Garden City

- [Garden City DCPI score](https://dchub.cloud/dcpi/garden-city)
- [Garden City market brief](https://dchub.cloud/markets/garden-city/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Garden City DCPI verdict changes

Email me when Garden City's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Garden City: 200 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=garden-city) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=garden-city)

JSON: [/api/v1/markets/garden-city/deep-dive](https://dchub.cloud/api/v1/markets/garden-city/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Garden City","item":"https://dchub.cloud/markets/garden-city"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Garden City Data Center Market Deep-Dive",
 "datePublished":"2026-11-06T09:55:28.516923+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/garden-city",
 "wordCount":244,
 "about":{"@type":"Place","name":"Garden City"},
 "description":"Live data-center market analysis. DCPI score 49.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "garden-city", "name": "Garden City Data Center Market — DC Hub", "description": "Live data-center market measurements for Garden City, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/garden-city", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Garden City"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 200.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:54."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:54.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:54."}], "dateModified": "2026-11-06", "temporalCoverage": "2026-11-06"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/garden-city#webpage", "url": "https://dchub.cloud/markets/garden-city", "name": "Garden City data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Garden City data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Garden City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Garden City data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Garden City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
