# Gainesville data center market

Power availability in Gainesville: DCPI verdict AVOID, composite score 30.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Gainesville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Gainesville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Gainesville

DC Hub does not hold a lease-rate figure for this market yet.

The University of Florida operates two facilities, Microsoft maintains two sites, and GAINESVILLE CROSSING DATA CAMPUS and its purchaser entity each control one. No facility in the market has reported megawatt capacity to DC Hub's tracking system, limiting visibility into total deployable infrastructure.

Together, these readings indicate that securing new power allocations will require either negotiation with incumbent offtakers, upstream infrastructure upgrades, or alternative supply arrangements.

Deal activity in Gainesville has stalled. No recent transactions are tracked, and the operator roster shows no consolidation, acquisitions, or shifts in site control. The stability of the current five-operator structure—anchored by hyperscalers AWS and Microsoft alongside the university's dual footprint—has persisted without material disruption.

## Data centers in Gainesville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty GNV (8217 Linton Hall)](https://dchub.cloud/facilities/digital-realty-digital-realty-gnv-8217-linton-hall-8ee3ff0d) | Digital Realty | Operational |  |
| [Microsoft Data Center 1](https://dchub.cloud/facilities/microsoft-microsoft-data-center-1-35059078) | Microsoft | Operational |  |
| [Microsoft Data Center 2](https://dchub.cloud/facilities/microsoft-microsoft-data-center-2-687d70d1) | Microsoft | Operational |  |
| [NTT GLOBAL DATA CENTERS VA10 LLC](https://dchub.cloud/facilities/ntt-global-data-centers-va10-llc-f7502b22) | NTT Global Data Centers |  |  |
| [NTT VA11 Data Center](https://dchub.cloud/facilities/ntt-ntt-va11-data-center-095c4fec) | NTT | Operational |  |
| [UF Research Computing Center](https://dchub.cloud/facilities/university-of-florida-uf-research-computing-center-d6372d02) | University of Florida | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Gainesville

- [Gainesville DCPI score](https://dchub.cloud/dcpi/gainesville)
- [Gainesville market brief](https://dchub.cloud/markets/gainesville/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Gainesville DCPI verdict changes

Email me when Gainesville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Gainesville market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=gainesville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=gainesville)

JSON: [/api/v1/markets/gainesville/deep-dive](https://dchub.cloud/api/v1/markets/gainesville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Gainesville","item":"https://dchub.cloud/markets/gainesville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Gainesville Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T09:02:11.890173+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/gainesville",
 "wordCount":237,
 "about":{"@type":"Place","name":"Gainesville"},
 "description":"Live data-center market analysis. DCPI score 30.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "gainesville", "name": "Gainesville Data Center Market — DC Hub", "description": "Live data-center market measurements for Gainesville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/gainesville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Gainesville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:00."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:00.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:00."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/gainesville#webpage", "url": "https://dchub.cloud/markets/gainesville", "name": "Gainesville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Gainesville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Gainesville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Gainesville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Gainesville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```