---
description: Is Fremont a good data center market for power? DCPI verdict CAUTION, score 49.6/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Fremont data centers: power, grid and capacity | DC Hub"
---

# Fremont data center market

Power availability in Fremont: DCPI verdict CAUTION, composite score 49.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 303 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Fremont data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Fremont market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Fremont

DC Hub does not hold a lease-rate figure for this market yet.

Fremont's data center market remains lightly tracked with five facilities under observation, dominated by Hurricane Electric's dual presence alongside single-site operators QES Computers and XO. The market has registered no recent deal activity in the tracked dataset, indicating a period of transactional quiet that contrasts with broader consolidation trends visible in adjacent California markets and nationally.

The DCPI verdict of CAUTION reflects a mixed signal on power access.

Operator concentration remains modest. Hurricane Electric's two-facility footprint makes it the largest tracked presence, while XO and QES Computers each maintain single sites, creating a fragmented ownership structure.

Forward momentum will likely depend on whether the region's power availability advantage can anchor new project financing amid broader California grid pressures and competition from markets with more transparent interconnection frameworks.

## Data centers in Fremont

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Hurricane Electric Fremont 2](https://dchub.cloud/facilities/hurricane-electric-hurricane-electric-fremont-2-885deac3) | Hurricane Electric | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Fremont

- [Fremont DCPI score](https://dchub.cloud/dcpi/fremont)
- [Fremont market brief](https://dchub.cloud/markets/fremont/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Fremont DCPI verdict changes

Email me when Fremont's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Fremont market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=fremont) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=fremont)

JSON: [/api/v1/markets/fremont/deep-dive](https://dchub.cloud/api/v1/markets/fremont/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Fremont","item":"https://dchub.cloud/markets/fremont"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Fremont Data Center Market Deep-Dive",
 "datePublished":"2026-11-06T09:55:14.247304+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/fremont",
 "wordCount":303,
 "about":{"@type":"Place","name":"Fremont"},
 "description":"Live data-center market analysis. DCPI score 49.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "fremont", "name": "Fremont Data Center Market — DC Hub", "description": "Live data-center market measurements for Fremont, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/fremont", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Fremont"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:31."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:31.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:31."}], "dateModified": "2026-11-06", "temporalCoverage": "2026-11-06"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/fremont#webpage", "url": "https://dchub.cloud/markets/fremont", "name": "Fremont data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Fremont data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Fremont market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Fremont data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Fremont market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
