description: Is Fort Worth a good data center market for power? DCPI verdict CAUTION, score 45.0/100 (ERCOT), as of 2026-11-12. 80 MW tracked across all listings, unverified included (as of 2026-11-06). Grid, queue and deal context for 300+ markets.
title: "Fort Worth data centers: power, grid and capacity | DC Hub"
---

# Fort Worth data center market

Power availability in Fort Worth: DCPI verdict CAUTION, composite score 45 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 239 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Fort Worth data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Fort Worth market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.0/100**

MW, all listings**80**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Fort Worth at a glance

Fort Worth has 80 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Edged (80 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 80 |
| Total listed | 80 |

## Developers building or planning in Fort Worth

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Edged | 80 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Fort Worth

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Dallas-Ft. Worth (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

QTS Realty and Meta each operate two sites; Alpheus Communications, Centersquare, and other operators hold single facilities. However, no tracked sales, acquisitions, or lease deals have closed recently, leaving operator positioning static.

The DCPI verdict of Caution reflects moderate tension between power availability and demand. Together, these scores signal that incremental power for new facilities is feasible but not assured without grid or utility investment. Operators seeking to add capacity should expect standard lead times for utility coordination rather than either wide-open availability or acute shortage scenarios.

QTS Realty and Meta's dual-site presence in Fort Worth may reflect legacy positioning rather than active expansion; without recent deal records, their investment roadmaps remain opaque. Smaller operators including Alpheus and Centersquare hold single assets, typical of pre-consolidation market structure.

## Data centers in Fort Worth

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Edged Texas 1](https://dchub.cloud/facilities/edged-edged-texas-1-57a1a7e6) | Edged | Under Construction | 80 |
| [Alpheus Fort Worth (307 W 7th St)](https://dchub.cloud/facilities/alpheus-communications-alpheus-fort-worth-307-w-7th-st-8b7ae668) | Alpheus Communications | Operational |  |
| [Centersquare Dallas (DFW1)](https://dchub.cloud/facilities/centersquare-centersquare-dallas-dfw1-fab596de) | Centersquare | Operational |  |
| [Charles Schwab Data Center](https://dchub.cloud/facilities/charles-schwab-data-center-58475f38) |  | Operational |  |
| [Cyxtera Dallas-Fort Worth Data Center](https://dchub.cloud/facilities/cyxtera-cyxtera-dallas-fort-worth-data-center-59a15b65) | Cyxtera | Operational |  |
| [Novartis](https://dchub.cloud/facilities/novartis-novartis-639d5d6a) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Fort Worth

- [Fort Worth DCPI score](https://dchub.cloud/dcpi/fort-worth)
- [Fort Worth market brief](https://dchub.cloud/markets/fort-worth/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Fort Worth DCPI verdict changes

Email me when Fort Worth's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Fort Worth: 80 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=fort-worth) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=fort-worth)

JSON: [/api/v1/markets/fort-worth/deep-dive](https://dchub.cloud/api/v1/markets/fort-worth/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Fort Worth","item":"https://dchub.cloud/markets/fort-worth"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Fort Worth Data Center Market Deep-Dive",
 "datePublished":"2026-11-06T09:54:44.198375+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/fort-worth",
 "wordCount":239,
 "about":{"@type":"Place","name":"Fort Worth"},
 "description":"Live data-center market analysis. DCPI score 45.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "fort-worth", "name": "Fort Worth Data Center Market — DC Hub", "description": "Live data-center market measurements for Fort Worth, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/fort-worth", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Fort Worth"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 80.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:05."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:05.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:05."}], "dateModified": "2026-11-06", "temporalCoverage": "2026-11-06"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/fort-worth#webpage", "url": "https://dchub.cloud/markets/fort-worth", "name": "Fort Worth data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Fort Worth data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Fort Worth market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Fort Worth data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Fort Worth market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```