---
description: Is Englewood a good data center market for power? DCPI verdict CAUTION, score 53.5/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Englewood data centers: power, grid and capacity | DC Hub"
---

# Englewood data center market

Power availability in Englewood: DCPI verdict CAUTION, composite score 53.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Englewood data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Englewood market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**53.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Englewood

DC Hub does not hold a lease-rate figure for this market yet.

The market shows fragmented control with no single operator commanding dominant presence. Individual facility-level power reporting remains sparse—only one tracked site has disclosed megawatt figures—limiting visibility into aggregate demand and utilization patterns.

The DCPI verdict of CAUTION reflects tension between power availability and delivery infrastructure. Operators planning new capacity or expansion should expect to navigate local grid interconnection timelines and potential upgrade costs. The gap between available generation and delivery capability is the core friction point for new power procurement in this market.

Recent deal tracking shows no announced transactions in Englewood over the tracked period, despite broader industry activity elsewhere. Flexential and Equinix maintain dual-site footholds, while EdgeConneX similarly operates two locations. The absence of recent deal flow does not characterize operator appetite or investment posture; it reflects what has been formally announced and recorded in the tracked window.

## Data centers in Englewood

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centersquare Denver (DEN2)](https://dchub.cloud/facilities/centersquare-centersquare-denver-den2-3a2942ca) | Centersquare | Operational |  |
| [DataBank Denver (DEN1)](https://dchub.cloud/facilities/databank-databank-denver-den1-445c12fe) | DataBank | Operational |  |
| [EQUINIX LLC - VDC I LLC](https://dchub.cloud/facilities/equinix-llc-vdc-i-llc-af6c302b) | Equinix |  |  |
| [EdgeConneX Denver (EDCDEN01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-denver-edcden01-1830840c) | EdgeConneX Inc. | Operational |  |
| [Equinix DE1 - Denver](https://dchub.cloud/facilities/equinix-equinix-de1-denver-fc4faed1) | Equinix | Operational |  |
| [Flexential - Denver/Englewood (DEN11)](https://dchub.cloud/facilities/flexential-corp-flexential-denverenglewood-den11-41df74df) | Flexential Corp. | Operational |  |
| [US Signal CO01 - Denver](https://dchub.cloud/facilities/oneneck-it-solutions-llc-us-signal-co01-denver-9d784ab5) | OneNeck IT Solutions LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Colorado](https://dchub.cloud/facilities/in/us/colorado).

## More on Englewood

- [Englewood DCPI score](https://dchub.cloud/dcpi/englewood)
- [Englewood market brief](https://dchub.cloud/markets/englewood/brief)
- [Colorado data center market brief](https://dchub.cloud/states/colorado/brief)
- [Colorado data center tax incentives](https://dchub.cloud/states/colorado/data-center-incentives)

### Email me when the Englewood DCPI verdict changes

Email me when Englewood's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Englewood market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=englewood) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=englewood)

JSON: [/api/v1/markets/englewood/deep-dive](https://dchub.cloud/api/v1/markets/englewood/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Englewood","item":"https://dchub.cloud/markets/englewood"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Englewood Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T09:00:51.553642+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/englewood",
 "wordCount":231,
 "about":{"@type":"Place","name":"Englewood"},
 "description":"Live data-center market analysis. DCPI score 53.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "englewood", "name": "Englewood Data Center Market — DC Hub", "description": "Live data-center market measurements for Englewood, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/englewood", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Englewood"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 53.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:15."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:15.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:15."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/englewood#webpage", "url": "https://dchub.cloud/markets/englewood", "name": "Englewood data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Englewood data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Englewood market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Englewood data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Englewood market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
