description: Is Emeryville a good data center market for power? DCPI verdict CAUTION, score 50.3/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Emeryville data centers: power, grid and capacity | DC Hub"
---

# Emeryville data center market

Power availability in Emeryville: DCPI verdict CAUTION, composite score 50.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 246 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Emeryville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Emeryville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Emeryville

DC Hub does not hold a lease-rate figure for this market yet.

Emeryville's tracked data center footprint comprises five facilities distributed across four operators, with Lumen Technologies holding two sites and Open Computing Facility, VPLS, and Lumen Technologies Inc each operating single locations. The market shows modest consolidation around incumbent carriers and specialized operators rather than hyperscale dominance. Only one tracked site has submitted operational power data to DC Hub, limiting visibility into aggregate demand patterns and utilization rates across the market.

This combination suggests that adding new power supply to Emeryville sites is feasible but not frictionless—operators should expect to navigate utility interconnection timelines, local transmission limitations, or existing contractual allocations that may delay or restrict deployment of additional megawatts.

Recent deal tracking shows no announced transactions in Emeryville over the current window. The operator roster reflects established regional and national carriers: Lumen's dual presence anchors the market, while OCF and VPLS represent smaller-footprint players. Absence of recent M&A, lease announcements, or expansions does not indicate market softness; rather, it reflects the baseline activity level for a five-site market with primarily mature, operational infrastructure.

## Data centers in Emeryville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Level(3) Oakland](https://dchub.cloud/facilities/lumen-technologies-level3-oakland-0ede8888) | Lumen Technologies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Emeryville

- [Emeryville DCPI score](https://dchub.cloud/dcpi/emeryville)
- [Emeryville market brief](https://dchub.cloud/markets/emeryville/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Emeryville DCPI verdict changes

Email me when Emeryville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Emeryville market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=emeryville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=emeryville)

JSON: [/api/v1/markets/emeryville/deep-dive](https://dchub.cloud/api/v1/markets/emeryville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Emeryville","item":"https://dchub.cloud/markets/emeryville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Emeryville Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T05:25:00.961840+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/emeryville",
 "wordCount":246,
 "about":{"@type":"Place","name":"Emeryville"},
 "description":"Live data-center market analysis. DCPI score 50.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "emeryville", "name": "Emeryville Data Center Market — DC Hub", "description": "Live data-center market measurements for Emeryville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/emeryville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Emeryville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:49."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:49.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:49."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/emeryville#webpage", "url": "https://dchub.cloud/markets/emeryville", "name": "Emeryville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Emeryville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Emeryville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Emeryville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Emeryville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```