description: Is Ellendale a good data center market for power? DCPI verdict AVOID, score 33.4/100 (MISO), as of 2026-11-12. 475 MW tracked across all listings, unverified included. Grid, queue and deal context for 300+ markets.
title: "Ellendale data centers: power, grid and capacity | DC Hub"
---

# Ellendale data center market

Power availability in Ellendale: DCPI verdict AVOID, composite score 33.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Ellendale data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Ellendale market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**33.4/100**

MW, all listings**475**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**AVOID**

## Ellendale at a glance

Ellendale has 100 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Applied Digital (100 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 100 |
| Total listed | 100 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Ellendale

DC Hub does not hold a lease-rate figure for this market yet.

Ellendale hosts 475 MW across five tracked facilities, anchored by Applied Digital's five sites. The market's infrastructure reflects recent capacity expansion—Applied Digital added 75 MW at its campus, bringing that footprint to 250 MW across multiple buildings. A separate data center facility has requested annexation into the municipality, signaling real estate integration with local governance. The geography remains concentrated, with no secondary operators visible in the tracked asset base.

Deal flow in Ellendale remains sparse. No recent transactions are tracked in the dataset, and the operator base shows minimal diversification. Applied Digital's dominant position across five facilities suggests a single-operator market with limited M&A activity or competitive entry recorded in the tracked period.

Power procurement will likely remain the primary variable shaping future development in Ellendale.

## Data centers in Ellendale

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Applied Digital Ellendale](https://dchub.cloud/facilities/applied-digital-applied-digital-ellendale-da688008) | Applied Digital | Operational | 100 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [North Dakota](https://dchub.cloud/facilities/in/us/north-dakota).

## More on Ellendale

- [Ellendale DCPI score](https://dchub.cloud/dcpi/ellendale)
- [Ellendale market brief](https://dchub.cloud/markets/ellendale/brief)
- [North Dakota data center market brief](https://dchub.cloud/states/north-dakota/brief)
- [North Dakota data center tax incentives](https://dchub.cloud/states/north-dakota/data-center-incentives)

### Email me when the Ellendale DCPI verdict changes

Email me when Ellendale's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Ellendale: 475 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=ellendale) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=ellendale)

JSON: [/api/v1/markets/ellendale/deep-dive](https://dchub.cloud/api/v1/markets/ellendale/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Ellendale","item":"https://dchub.cloud/markets/ellendale"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Ellendale Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T05:24:52.191821+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/ellendale",
 "wordCount":228,
 "about":{"@type":"Place","name":"Ellendale"},
 "description":"Live data-center market analysis. DCPI score 33.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "ellendale", "name": "Ellendale Data Center Market — DC Hub", "description": "Live data-center market measurements for Ellendale, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/ellendale", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Ellendale"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 475.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 33.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:34."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:34.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:34."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/ellendale#webpage", "url": "https://dchub.cloud/markets/ellendale", "name": "Ellendale data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Ellendale data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Ellendale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Ellendale data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Ellendale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```