---
description: Is Elk Grove Village a good data center market for power? DCPI verdict AVOID, score 19.2/100 (PJM), as of 2026-11-12. 97 MW tracked across all listings, unverified included. Grid, queue and deal context for 300+ markets.
title: "Elk Grove Village data centers: power, grid and capacity | DC Hub"
---

# Elk Grove Village data center market

Power availability in Elk Grove Village: DCPI verdict AVOID, composite score 19.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Elk Grove Village data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Elk Grove Village market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.2/100**

MW, all listings**97**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Elk Grove Village at a glance

Elk Grove Village has 97 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (42 MW), Stack Infrastructure (40 MW) and EdgeConneX (10 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 97 |
| Total listed | 97 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Elk Grove Village

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty operates the largest footprint with five sites, followed by Microsoft and two other operators each running four and three facilities respectively. The market remains fragmented across a relatively small geographic node within the Chicago metropolitan region, with media coverage indicating sustained local awareness of data center operations and their municipal impact.

The DCPI verdict flags Elk Grove as a market to avoid for new power procurement. This combination suggests that operators seeking to expand footprint or add capacity in Elk Grove will face material friction in accessing new power allocations from the grid or existing infrastructure.

Deal activity in Elk Grove has stalled entirely, with no recent transactions tracked in the market. The operator roster—dominated by Digital Realty, Microsoft, EdgeConneX, and T5 Data Centers—appears stable and consolidated, with no recent M&A or divestment activity to signal shifts in market control or investment appetite. Centersquare's two-facility presence rounds out the top-five operator base. The absence of deal flow contrasts with broader regional consolidation visible in adjacent Illinois markets, where larger platform acquisitions and strategic repositioning continue.

## Data centers in Elk Grove Village

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [STACK Chicago CHI01](https://dchub.cloud/facilities/stack-infrastructure-stack-chicago-chi01-092d0ec5) | Stack Infrastructure | Operational | 40 |
| [Digital Realty CH1](https://dchub.cloud/facilities/digital-realty-digital-realty-ch1-21aa5b41) | Digital Realty | Operational | 14 |
| [Digital Realty CH2](https://dchub.cloud/facilities/digital-realty-digital-realty-ch2-6fb5e9b8) | Digital Realty | Operational | 14 |
| [Digital Realty CH3](https://dchub.cloud/facilities/digital-realty-digital-realty-ch3-975ad70f) | Digital Realty | Operational | 14 |
| [EdgeConneX CHI01](https://dchub.cloud/facilities/edgeconnex-edgeconnex-chi01-6ce55758) | EdgeConneX | Operational | 5 |
| [EdgeConneX CHI02](https://dchub.cloud/facilities/edgeconnex-edgeconnex-chi02-48485ca0) | EdgeConneX | Operational | 5 |
| [Skybox Chicago I](https://dchub.cloud/facilities/skybox-skybox-chicago-i-667cd6d8) | Skybox | Operational | 5 |
| [CDC5 - 2200 Busse Rd](https://dchub.cloud/facilities/colocation-america-corporation-cdc5-2200-busse-rd-e883f279) | Colocation America Corporation | Operational |  |
| [Centersquare Chicago (ORD2)](https://dchub.cloud/facilities/centersquare-centersquare-chicago-ord2-83fedc29) | Centersquare | Operational |  |
| [Digital Realty ORD3 Elk Grove](https://dchub.cloud/facilities/digital-realty-digital-realty-ord3-elk-grove-b91c77d8) | Digital Realty | Operational |  |
| [EQUINIX LLC](https://dchub.cloud/facilities/equinix-llc-elk-grove-village-50933d8b) | Equinix |  |  |
| [EdgeConneX Chicago (EDCCHI02)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-chicago-edcchi02-7e89ed51) | EdgeConneX Inc. | Operational |  |
| [Equinix CH3 - Elk Grove](https://dchub.cloud/facilities/equinix-equinix-ch3-elk-grove-67a61b4b) | Equinix | Operational |  |
| [Forsythe Data Centers](https://dchub.cloud/facilities/forsythe-data-centers-forsythe-data-centers-76e4eb7b) |  | Operational |  |
| [Stream Data Centers - Chicago II](https://dchub.cloud/facilities/stream-data-centers-stream-data-centers-chicago-ii-51f8eb45) | Stream Data Centers | Operational |  |
| [T5 Chicago II](https://dchub.cloud/facilities/t5-data-centers-t5-chicago-ii-328fb922) | T5 Data Centers | Operational |  |
| [T5@Chicago](https://dchub.cloud/facilities/t5-data-centers-t5chicago-55fa3bf5) | T5 Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Elk Grove Village

- [Elk Grove Village DCPI score](https://dchub.cloud/dcpi/elk-grove-village)
- [Elk Grove Village market brief](https://dchub.cloud/markets/elk-grove-village/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Elk Grove Village DCPI verdict changes

Email me when Elk Grove Village's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Elk Grove Village: 97 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=elk-grove-village) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=elk-grove-village)

JSON: [/api/v1/markets/elk-grove-village/deep-dive](https://dchub.cloud/api/v1/markets/elk-grove-village/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Elk Grove Village","item":"https://dchub.cloud/markets/elk-grove-village"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Elk Grove Village Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T05:24:43.284510+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/elk-grove-village",
 "wordCount":254,
 "about":{"@type":"Place","name":"Elk Grove Village"},
 "description":"Live data-center market analysis. DCPI score 19.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "elk-grove-village", "name": "Elk Grove Village Data Center Market — DC Hub", "description": "Live data-center market measurements for Elk Grove Village, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/elk-grove-village", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Elk Grove Village"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 97.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:45."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/elk-grove-village#webpage", "url": "https://dchub.cloud/markets/elk-grove-village", "name": "Elk Grove Village data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Elk Grove Village data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Elk Grove Village market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Elk Grove Village data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Elk Grove Village market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
