---
description: Is El Segundo a good data center market for power? DCPI verdict CAUTION, score 48.7/100 (CAISO), as of 2026-11-12. 42 MW tracked across all listings, unverified included. Grid, queue and deal context for 300+ markets.
title: "El Segundo data centers: power, grid and capacity | DC Hub"
---

# El Segundo data center market

Power availability in El Segundo: DCPI verdict CAUTION, composite score 48.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 246 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the El Segundo data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the El Segundo market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.7/100**

MW, all listings**42**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## El Segundo at a glance

El Segundo has 42 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are ServerFarm (28 MW) and Digital Realty (14 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 42 |
| Total listed | 42 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in El Segundo

DC Hub does not hold a lease-rate figure for this market yet.

The market has not recorded recent deal activity in the tracked dataset. The operator roster shows fragmentation typical of secondary West Coast markets, with no single player commanding majority capacity.

This split signals that while some power capacity exists in the region, accessing it for new development faces material headwinds. The verdict does not forecast scarcity that bars entry, but rather flags that power secured through standard channels may encounter delays or capacity limitations.

Across neighboring markets, consolidation continues—Digital Realty's 600 MW Kansas campus development and related M&A activity underscores ongoing greenfield and acquisition strategies among regional players—yet El Segundo's own deal flow remains flat. The operator mix (Digital Realty at 3 sites, Equinix at 2, and smaller ServerFarm presence) shows neither dominant concentration nor clear exit signals; market composition simply has not shifted in the recent tracked period.

## Data centers in El Segundo

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [ServerFarm Los Angeles](https://dchub.cloud/facilities/serverfarm-serverfarm-los-angeles-e3c16e25) | ServerFarm | Operational | 28 |
| [DRT LAX12](https://dchub.cloud/facilities/digital-realty-drt-lax12-c85c24ee) | Digital Realty | Operational | 14 |
| [Digital Realty LAX (2260 E El Segundo)](https://dchub.cloud/facilities/digital-realty-digital-realty-lax-2260-e-el-segundo-79293853) | Digital Realty | Operational |  |
| [Digital Realty LAX39 El Segundo](https://dchub.cloud/facilities/digital-realty-digital-realty-lax39-el-segundo-b7f800e7) | Digital Realty | Operational |  |
| [Equinix LA2 El Segundo](https://dchub.cloud/facilities/equinix-equinix-la2-el-segundo-0692bbe5) | Equinix | Operational |  |
| [Equinix LA3/LA4 - Los Angeles, El Segundo](https://dchub.cloud/facilities/equinix-equinix-la3la4-los-angeles-el-segundo-11d377ab) | Equinix | Operational |  |
| [Serverfarm LAX1 Los Angeles](https://dchub.cloud/facilities/serverfarm-serverfarm-lax1-los-angeles-a94ff754) | Serverfarm | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on El Segundo

- [El Segundo DCPI score](https://dchub.cloud/dcpi/el-segundo)
- [El Segundo market brief](https://dchub.cloud/markets/el-segundo/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the El Segundo DCPI verdict changes

Email me when El Segundo's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

El Segundo: 42 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=el-segundo) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=el-segundo)

JSON: [/api/v1/markets/el-segundo/deep-dive](https://dchub.cloud/api/v1/markets/el-segundo/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"El Segundo","item":"https://dchub.cloud/markets/el-segundo"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"El Segundo Data Center Market Deep-Dive",
 "datePublished":"2026-11-12T05:24:26.257332+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/el-segundo",
 "wordCount":246,
 "about":{"@type":"Place","name":"El Segundo"},
 "description":"Live data-center market analysis. DCPI score 48.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "el-segundo", "name": "El Segundo Data Center Market — DC Hub", "description": "Live data-center market measurements for El Segundo, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/el-segundo", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "El Segundo"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 42.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:47."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:47.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:47."}], "dateModified": "2026-11-12", "temporalCoverage": "2026-11-12"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/el-segundo#webpage", "url": "https://dchub.cloud/markets/el-segundo", "name": "El Segundo data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the El Segundo data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the El Segundo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the El Segundo data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the El Segundo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
