---
description: Is Edison a good data center market for power? DCPI verdict AVOID, score 22.8/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Edison data centers: power, grid and capacity | DC Hub"
---

# Edison data center market

Power availability in Edison: DCPI verdict AVOID, composite score 22.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 190 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Edison data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Edison market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-09, when the Data Center Power Index for this market read 23.0. The index is recomputed through the day and reads 22.8 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Edison

DC Hub does not hold a lease-rate figure for this market yet.

Power capacity data is limited; only one tracked site has reported megawatt figures to DC Hub. The operator base is highly concentrated, with Iron Mountain entities accounting for two of the three named operators in the market.

The DCPI verdict flags Edison as a site to avoid for new power development. Together, these metrics reflect a market where additional power procurement for new or expanded facilities will face friction.

Recent deal activity in Edison is not tracked by DC Hub. However, no transaction flow is visible in Edison specifically during the tracked period.

## Data centers in Edison

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Iron Mountain Data Center - New Jersey (NJE-1)](https://dchub.cloud/facilities/iron-mountain-data-centers-iron-mountain-data-center-new-jersey-nje-1-60dbf452) | Iron Mountain Data Centers | Operational |  |
| [Iron Mountain NJ1 Edison](https://dchub.cloud/facilities/iron-mountain-iron-mountain-nj1-edison-4ddf5873) | Iron Mountain | Operational |  |
| [NJ 1 DATA CENTER](https://dchub.cloud/facilities/nj-1-data-center-feccb0ad) |  |  |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Edison

- [Edison DCPI score](https://dchub.cloud/dcpi/edison)
- [Edison market brief](https://dchub.cloud/markets/edison/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Edison DCPI verdict changes

Email me when Edison's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Edison market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=edison) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=edison)

JSON: [/api/v1/markets/edison/deep-dive](https://dchub.cloud/api/v1/markets/edison/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Edison","item":"https://dchub.cloud/markets/edison"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Edison Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T05:25:18.985350+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/edison",
 "wordCount":190,
 "about":{"@type":"Place","name":"Edison"},
 "description":"Live data-center market analysis. DCPI score 22.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "edison", "name": "Edison Data Center Market — DC Hub", "description": "Live data-center market measurements for Edison, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/edison", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Edison"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:52."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:52.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:52."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/edison#webpage", "url": "https://dchub.cloud/markets/edison", "name": "Edison data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Edison data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Edison market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Edison data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Edison market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
