---
description: Is Eden Prairie a good data center market for power? DCPI verdict CAUTION, score 47.7/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Eden Prairie data centers: power, grid and capacity | DC Hub"
---

# Eden Prairie data center market

Power availability in Eden Prairie: DCPI verdict CAUTION, composite score 47.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 265 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Eden Prairie data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Eden Prairie market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Eden Prairie

DC Hub does not hold a lease-rate figure for this market yet.

Eden Prairie's tracked data center footprint comprises three facilities operated by EdgeConneX (two sites) and OneNeck IT Solutions LLC (one site). The market has not reported aggregate capacity figures. Operator presence is concentrated, with EdgeConneX holding a majority position across the region's documented infrastructure. No recent deal activity has been tracked in this market during the monitoring period.

Together, these scores indicate that operators planning new facilities or expansions should anticipate conditional approval timelines and may face infrastructure upgrade requirements before power becomes available at scale.

The absence of recent tracked deal activity in Eden Prairie contrasts with consolidation patterns visible in nearby Eagan, where DataBank has pursued acquisition-driven portfolio expansion. This absence of transaction flow in Eden Prairie itself reflects either mature asset positioning among current operators or a market pause in new development activity. The three-facility base and two-operator concentration suggest a stable but limited competitive landscape. Without announced deals, the current operator roster—EdgeConneX and OneNeck—remains the primary infrastructure anchors.

## Data centers in Eden Prairie

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [EdgeConneX Minneapolis (EDCMSP01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-minneapolis-edcmsp01-35b9fdd4) | EdgeConneX Inc. | Operational |  |
| [US Signal MN01 - Minneapolis](https://dchub.cloud/facilities/oneneck-it-solutions-llc-us-signal-mn01-minneapolis-cc7dd051) | OneNeck IT Solutions LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Minnesota](https://dchub.cloud/facilities/in/us/minnesota).

## More on Eden Prairie

- [Eden Prairie DCPI score](https://dchub.cloud/dcpi/eden-prairie)
- [Eden Prairie market brief](https://dchub.cloud/markets/eden-prairie/brief)
- [Minnesota data center market brief](https://dchub.cloud/states/minnesota/brief)
- [Minnesota data center tax incentives](https://dchub.cloud/states/minnesota/data-center-incentives)

### Email me when the Eden Prairie DCPI verdict changes

Email me when Eden Prairie's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Eden Prairie market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=eden-prairie) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=eden-prairie)

JSON: [/api/v1/markets/eden-prairie/deep-dive](https://dchub.cloud/api/v1/markets/eden-prairie/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Eden Prairie","item":"https://dchub.cloud/markets/eden-prairie"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Eden Prairie Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T05:25:03.600079+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/eden-prairie",
 "wordCount":265,
 "about":{"@type":"Place","name":"Eden Prairie"},
 "description":"Live data-center market analysis. DCPI score 47.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "eden-prairie", "name": "Eden Prairie Data Center Market — DC Hub", "description": "Live data-center market measurements for Eden Prairie, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/eden-prairie", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Eden Prairie"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:30."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:30.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:30."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/eden-prairie#webpage", "url": "https://dchub.cloud/markets/eden-prairie", "name": "Eden Prairie data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Eden Prairie data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Eden Prairie market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Eden Prairie data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Eden Prairie market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
