# East Wenatchee data center market

Power availability in East Wenatchee: DCPI verdict CAUTION, composite score 47.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 261 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the East Wenatchee data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the East Wenatchee market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in East Wenatchee

DC Hub does not hold a lease-rate figure for this market yet.

No single operator commands the market; the three tracked sites represent known deployments, though full market capacity remains unreported. This distributed ownership structure contrasts with highly concentrated markets elsewhere in the region and creates multiple stakeholders in local infrastructure decisions.

The DCPI verdict of CAUTION reflects a market sitting at an inflection point on power availability. Together, these scores suggest that new projects are feasible but will face real execution challenges: grid connections, utility coordination, or local permitting bottlenecks are plausible friction points, not theoretical ones. Sites already in operation have power; the question is whether the utility backbone and interconnection pathways can handle incremental load economically and on reasonable timelines.

No recent deals have been tracked in East Wenatchee, which means no announced new deployments, expansions, or capacity additions are on record. This silence does not indicate market weakness or stalled interest; it reflects current deal flow. The operator base remains stable and diversified, reducing single-point risk but also distributing decision-making across competing entities.

Forward momentum in the Wenatchee region will likely depend on utility-side power provisioning and whether new generation or transmission capacity reaches East Wenatchee over the near term.

## Data centers in East Wenatchee

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Actapio](https://dchub.cloud/facilities/actapio-actapio-d45a2209) |  | Operational |  |
| [Intergate Columbia A](https://dchub.cloud/facilities/sabey-data-centers-intergate-columbia-a-99479d5a) | Sabey Data Centers | Operational |  |
| [Microsoft EAT03](https://dchub.cloud/facilities/microsoft-microsoft-eat03-ae659654) | Microsoft | Operational |  |
| [Microsoft EAT04](https://dchub.cloud/facilities/microsoft-microsoft-eat04-74581d40) | Microsoft | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on East Wenatchee

- [East Wenatchee DCPI score](https://dchub.cloud/dcpi/east-wenatchee)
- [East Wenatchee market brief](https://dchub.cloud/markets/east-wenatchee/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the East Wenatchee DCPI verdict changes

Email me when East Wenatchee's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

East Wenatchee market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=east-wenatchee) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=east-wenatchee)

JSON: [/api/v1/markets/east-wenatchee/deep-dive](https://dchub.cloud/api/v1/markets/east-wenatchee/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"East Wenatchee","item":"https://dchub.cloud/markets/east-wenatchee"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"East Wenatchee Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T05:24:55.487107+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/east-wenatchee",
 "wordCount":261,
 "about":{"@type":"Place","name":"East Wenatchee"},
 "description":"Live data-center market analysis. DCPI score 47.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "east-wenatchee", "name": "East Wenatchee Data Center Market — DC Hub", "description": "Live data-center market measurements for East Wenatchee, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/east-wenatchee", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "East Wenatchee"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:43."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:43.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:43."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/east-wenatchee#webpage", "url": "https://dchub.cloud/markets/east-wenatchee", "name": "East Wenatchee data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the East Wenatchee data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the East Wenatchee market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the East Wenatchee data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the East Wenatchee market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```