---
description: Is Eagle Mountain a good data center market for power? DCPI verdict CAUTION, score 47.9/100 (WECC), as of 2026-11-12. 700 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Eagle Mountain data centers: power, grid and capacity | DC Hub"
---

# Eagle Mountain data center market

Power availability in Eagle Mountain: DCPI verdict CAUTION, composite score 47.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 165 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Eagle Mountain data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Eagle Mountain market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.9/100**

MW, all listings**700**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## Eagle Mountain at a glance

Eagle Mountain has 350 MW under construction and 250 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are QTS (300 MW), Google (200 MW) and Meta (100 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 350 |
| Planned | 250 |
| Total listed | 600 |

## Developers building or planning in Eagle Mountain

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| QTS | 300 |  |
| Google |  | 200 |
| Meta | 50 | 50 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Eagle Mountain

DC Hub does not hold a lease-rate figure for this market yet.

The CAUTION verdict reflects a mixed backdrop for new power procurement. Projects seeking incremental power will face extended timelines for feasibility studies and interconnection queue positions rather than immediate availability.

Meta's continued expansion announcements indicate operator-led capacity growth rather than third-party acquisition activity. The six Meta-operated facilities represent the dominant footprint, while QTS and Google each hold single sites.

## Data centers in Eagle Mountain

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [QTS Eagle Mountain Campus](https://dchub.cloud/facilities/qts-qts-eagle-mountain-campus-b753d087) | QTS | Under Construction | 300 |
| [Google Eagle Mountain Data Center](https://dchub.cloud/facilities/google-google-eagle-mountain-data-center-ac813d27) | Google | Planned | 200 |
| [Meta Eagle Mountain Building 1](https://dchub.cloud/facilities/meta-meta-eagle-mountain-building-1-58498b0f) | Meta | Under Construction | 50 |
| [Meta Eagle Mountain Building 2](https://dchub.cloud/facilities/meta-meta-eagle-mountain-building-2-d647bab7) | Meta | Planned | 50 |
| [Meta Eagle Mountain Data Center](https://dchub.cloud/facilities/meta-meta-eagle-mountain-data-center-a675deb5) | Meta | Operational |  |
| [Meta Eagle Mountain Utah](https://dchub.cloud/facilities/meta-meta-eagle-mountain-utah-f8e32e50) | Meta | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Utah](https://dchub.cloud/facilities/in/us/utah).

## More on Eagle Mountain

- [Eagle Mountain DCPI score](https://dchub.cloud/dcpi/eagle-mountain)
- [Eagle Mountain market brief](https://dchub.cloud/markets/eagle-mountain/brief)
- [Utah data center market brief](https://dchub.cloud/states/utah/brief)
- [Utah data center tax incentives](https://dchub.cloud/states/utah/data-center-incentives)

### Email me when the Eagle Mountain DCPI verdict changes

Email me when Eagle Mountain's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Eagle Mountain: 700 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=eagle-mountain) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=eagle-mountain)

JSON: [/api/v1/markets/eagle-mountain/deep-dive](https://dchub.cloud/api/v1/markets/eagle-mountain/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Eagle Mountain","item":"https://dchub.cloud/markets/eagle-mountain"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Eagle Mountain Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:02:21.476838+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/eagle-mountain",
 "wordCount":165,
 "about":{"@type":"Place","name":"Eagle Mountain"},
 "description":"Live data-center market analysis. DCPI score 47.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "eagle-mountain", "name": "Eagle Mountain Data Center Market — DC Hub", "description": "Live data-center market measurements for Eagle Mountain, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/eagle-mountain", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Eagle Mountain"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 700.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:28."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:28.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:28."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/eagle-mountain#webpage", "url": "https://dchub.cloud/markets/eagle-mountain", "name": "Eagle Mountain data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Eagle Mountain data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Eagle Mountain market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Eagle Mountain data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Eagle Mountain market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
