# Durham data center market

Power availability in Durham: DCPI verdict AVOID, composite score 30.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 250 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Durham data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Durham market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.7/100**

MW, all listings**500**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Durham

DC Hub does not hold a lease-rate figure for this market yet.

The market currently lacks sufficient visibility into aggregate capacity—only one tracked facility publicly reports megawatt figures—which constrains precision in power-supply assessment.

The DCPI verdict of AVOID reflects a structural mismatch between available and required power. This combination leaves limited headroom for operators seeking grid or renewable interconnections; new entrants or expansion-stage operators will face difficulty securing incremental power allocations without substantial infrastructure investment or lengthy interconnection queues. The verdict does not address demand or market quality, only the feasibility of adding new power resources.

Operator concentration among CyrusOne entities suggests established players dominate the market, yet the absence of tracked deal flow indicates minimal portfolio turnover or consolidation activity. Compass Datacenters' single-site presence points to a market not presently attractive for rapid scale-through acquisition. This dormancy in M&A contrasts with WhiteFiber's North Carolina land plays, which remain geographically distant from Durham's existing stock and regulatory environment. Local regulatory headwinds have also emerged: Durham City Council passed a 60-day development moratorium, and Durham County leadership is weighing exemptions for smaller projects, adding permitting friction for new capacity additions.

## Data centers in Durham

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AceHost Durham](https://dchub.cloud/facilities/acehost-acehost-durham-c327515d) | AceHost | Operational |  |
| [Brandaleone Lab for Data and Visualization](https://dchub.cloud/facilities/duke-libraries-brandaleone-lab-for-data-and-visualization-5bf56f29) | Duke Libraries | Operational |  |
| [CyrusOne NC-1](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-nc-1-62844926) | CyrusOne Inc. | Operational |  |
| [Durham, NC, DUR1](https://dchub.cloud/facilities/cyrusone-durham-nc-dur1-2fff7083) | CyrusOne | Operational |  |
| [TierPoint Research Triangle Park – RTP](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-raleigh-rtp-4b680916) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [North Carolina](https://dchub.cloud/facilities/in/us/north-carolina).

## More on Durham

- [Durham DCPI score](https://dchub.cloud/dcpi/durham)
- [Durham market brief](https://dchub.cloud/markets/durham/brief)
- [North Carolina data center market brief](https://dchub.cloud/states/north-carolina/brief)
- [North Carolina data center tax incentives](https://dchub.cloud/states/north-carolina/data-center-incentives)

### Email me when the Durham DCPI verdict changes

Email me when Durham's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Durham: 500 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=durham) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=durham)

JSON: [/api/v1/markets/durham/deep-dive](https://dchub.cloud/api/v1/markets/durham/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Durham","item":"https://dchub.cloud/markets/durham"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Durham Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:02:04.365760+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/durham",
 "wordCount":250,
 "about":{"@type":"Place","name":"Durham"},
 "description":"Live data-center market analysis. DCPI score 30.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "durham", "name": "Durham Data Center Market — DC Hub", "description": "Live data-center market measurements for Durham, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/durham", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Durham"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 500.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:48."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/durham#webpage", "url": "https://dchub.cloud/markets/durham", "name": "Durham data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Durham data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Durham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Durham data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Durham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```