# Dulles data center market

Power availability in Dulles: DCPI verdict AVOID, composite score 21.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 213 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Dulles data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Dulles market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.7/100**

MW, all listings**210**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Dulles at a glance

Dulles has 150 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (150 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 150 |
| Total listed | 150 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Dulles

DC Hub does not hold a lease-rate figure for this market yet.

AWS maintains the largest footprint with nine tracked facilities in the region, while QTS and Centersquare each operate single sites. The market remains concentrated: AWS alone accounts for approximately 69 percent of tracked operator presence by facility count. No recent deals have been recorded in the Dulles registry.

Together, these metrics indicate that acquiring incremental power supply in Dulles faces structural headwinds from both generation availability and grid interconnection capacity.

Deal flow in the region remains inactive according to tracked records, with no recent transactions logged. The lack of recorded Dulles transactions does not reflect sector-wide momentum elsewhere in Northern Virginia, where expansion announcements and acquisitions continue.

Forward momentum in Dulles will depend on whether utility-scale power infrastructure can expand to match the region's existing 210 MW footprint and support additional facilities beyond current tracked projects.

## Data centers in Dulles

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Amazon IAD163](https://dchub.cloud/facilities/amazon-web-services-amazon-iad163-b60f7b5b) | Amazon Web Services | Operational | 50 |
| [Amazon IAD164](https://dchub.cloud/facilities/amazon-web-services-amazon-iad164-bd252e1a) | Amazon Web Services | Operational | 50 |
| [Amazon IAD174](https://dchub.cloud/facilities/amazon-web-services-amazon-iad174-9950cb83) | Amazon Web Services | Operational | 50 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Dulles

- [Dulles DCPI score](https://dchub.cloud/dcpi/dulles)
- [Dulles market brief](https://dchub.cloud/markets/dulles/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Dulles DCPI verdict changes

Email me when Dulles's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Dulles: 210 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=dulles) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=dulles)

JSON: [/api/v1/markets/dulles/deep-dive](https://dchub.cloud/api/v1/markets/dulles/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Dulles","item":"https://dchub.cloud/markets/dulles"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Dulles Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:01:46.705650+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/dulles",
 "wordCount":213,
 "about":{"@type":"Place","name":"Dulles"},
 "description":"Live data-center market analysis. DCPI score 21.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "dulles", "name": "Dulles Data Center Market — DC Hub", "description": "Live data-center market measurements for Dulles, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/dulles", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Dulles"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 210.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:06."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:06.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:06."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/dulles#webpage", "url": "https://dchub.cloud/markets/dulles", "name": "Dulles data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Dulles data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Dulles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Dulles data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Dulles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```