description: Is Dublin a good data center market for power? DCPI verdict AVOID, score 13.1/100 (EirGrid), as of 2026-11-12. 2,003 MW tracked across all listings, unverified included (as of 2026-11-10). Grid, queue and deal context for 300+ markets.
title: "Dublin data centers: power, grid and capacity | DC Hub"
---

# Dublin data center market

Power availability in Dublin: DCPI verdict AVOID, composite score 13.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 202 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Dublin data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Dublin market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**13.1/100**

MW, all listings**2,003**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Dublin at a glance

Dublin has 1,801 MW operational and 2 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (800 MW), Meta (500 MW) and Amazon Web Services (250 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 1,801 |
| Planned | 2 |
| Total listed | 1,803 |

## Developers building or planning in Dublin

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Core42 (G42) |  | 2 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Dublin

DC Hub does not hold a lease-rate figure for this market yet.

The market has recently secured planning approval for Google's data center expansion, signaling continued development pipeline activity in the region.

No recent deals have been tracked in Dublin's data center market. Operators in Dublin include hyperscalers alongside established colocation providers, though current deal flow data remains sparse in the tracked window.

## Data centers in Dublin

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS EU-West-1 Dublin Campus](https://dchub.cloud/facilities/amazon-web-services-aws-eu-west-1-dublin-campus-6f89e2eb) | Amazon Web Services | Operational | 200 |
| [Microsoft Dublin Data Center](https://dchub.cloud/facilities/microsoft-microsoft-dublin-data-center-02689f3f) | Microsoft | Operational | 200 |
| [Meta Clonee 1 Data Center](https://dchub.cloud/facilities/meta-meta-clonee-1-data-center-404180ad) | Meta | Operational | 100 |
| [Meta Clonee 2 Data Center](https://dchub.cloud/facilities/meta-meta-clonee-2-data-center-906c89cf) | Meta | Operational | 100 |
| [Meta Clonee 3 Data Center](https://dchub.cloud/facilities/meta-meta-clonee-3-data-center-4af607c0) | Meta | Operational | 100 |
| [Meta Clonee 5 Data Center](https://dchub.cloud/facilities/meta-meta-clonee-5-data-center-4354883a) | Meta | Operational | 100 |
| [Meta Clonee 6 Data Center](https://dchub.cloud/facilities/meta-meta-clonee-6-data-center-0c07d899) | Meta | Operational | 100 |
| [Google](https://dchub.cloud/facilities/google-google-5f3a5479) |  | Operational | 80 |
| [Amazon Web Services](https://dchub.cloud/facilities/amazon-web-services-amazon-web-services-7e958426) |  | Operational | 50 |
| [Amazon Web Services DUB10/50/51](https://dchub.cloud/facilities/amazon-web-services-amazon-web-services-dub105051-908d3a51) | Amazon Web Services | Operational | 50 |
| [Equinix DB Campus](https://dchub.cloud/facilities/equinix-equinix-db-campus-d12a8df3) | Equinix | Operational | 50 |
| [Microsoft DSF](https://dchub.cloud/facilities/microsoft-microsoft-dsf-75b6aef7) | Microsoft | Operational | 50 |
| [Microsoft DUB03 / DUB04](https://dchub.cloud/facilities/microsoft-microsoft-dub03-dub04-85ef3e0e) | Microsoft | Operational | 50 |
| [Microsoft DUB05](https://dchub.cloud/facilities/microsoft-microsoft-dub05-8165e099) | Microsoft | Operational | 50 |
| [Microsoft DUB06](https://dchub.cloud/facilities/microsoft-microsoft-dub06-a3c53582) | Microsoft | Operational | 50 |
| [Microsoft DUB07](https://dchub.cloud/facilities/microsoft-microsoft-dub07-9a0c1aba) | Microsoft | Operational | 50 |
| [Microsoft DUB08](https://dchub.cloud/facilities/microsoft-microsoft-dub08-6ec47a08) | Microsoft | Operational | 50 |
| [Microsoft DUB09](https://dchub.cloud/facilities/microsoft-microsoft-dub09-ca1c5c35) | Microsoft | Operational | 50 |
| [Microsoft DUB10](https://dchub.cloud/facilities/microsoft-microsoft-dub10-15514f8d) | Microsoft | Operational | 50 |
| [Microsoft DUB12](https://dchub.cloud/facilities/microsoft-microsoft-dub12-03ecb5d0) | Microsoft | Operational | 50 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Ireland](https://dchub.cloud/facilities/in/ie).

## More on Dublin

- [Dublin DCPI score](https://dchub.cloud/dcpi/dublin)
- [Dublin market brief](https://dchub.cloud/markets/dublin/brief)

### Email me when the Dublin DCPI verdict changes

Email me when Dublin's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Dublin: 2,003 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=dublin) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=dublin)

JSON: [/api/v1/markets/dublin/deep-dive](https://dchub.cloud/api/v1/markets/dublin/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Dublin","item":"https://dchub.cloud/markets/dublin"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Dublin Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:02:28.705175+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/dublin",
 "wordCount":202,
 "about":{"@type":"Place","name":"Dublin"},
 "description":"Live data-center market analysis. DCPI score 13.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "dublin", "name": "Dublin Data Center Market — DC Hub", "description": "Live data-center market measurements for Dublin, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/dublin", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Dublin"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 2003.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 13.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:17."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:17.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:17."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/dublin#webpage", "url": "https://dchub.cloud/markets/dublin", "name": "Dublin data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Dublin data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Dublin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Dublin data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Dublin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```