---
description: Is Douglasville a good data center market for power? DCPI verdict AVOID, score 22.7/100 (SOCO), as of 2026-11-12. 270 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Douglasville data centers: power, grid and capacity | DC Hub"
---

# Douglasville data center market

Power availability in Douglasville: DCPI verdict AVOID, composite score 22.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 243 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Douglasville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Douglasville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.7/100**

MW, all listings**270**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Douglasville at a glance

Douglasville has 270 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (150 MW) and CyrusOne (120 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 270 |
| Total listed | 270 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Douglasville

DC Hub does not hold a lease-rate figure for this market yet.

The market is fragmented among secondary operators including Aligned Data Centers, CoreWeave, and others. No recent deal activity has been recorded in this market segment.

The DCPI verdict of AVOID reflects structural tightness in Douglasville's power availability. Together, these metrics suggest that operators seeking to expand or build new facilities here would encounter material delays in power provisioning and face elevated costs to unlock additional supply from Georgia Power or local utilities.

Operator concentration around Flexential—which runs five of the market's tracked facilities—creates a mixed dynamic. Aligned Data Centers maintains a presence through at least two tracked entries, while newer entrants like CoreWeave operate single sites. The absence of tracked M&A activity in Douglasville contrasts with broader regional momentum: nearby markets have seen operators like Carrier Connect secure full-facility leases and larger consolidation plays emerge across Georgia.

## Data centers in Douglasville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Douglas County](https://dchub.cloud/facilities/google-google-douglas-county-c4ece6da) | Google | Operational | 150 |
| [CyrusOne Atlanta](https://dchub.cloud/facilities/cyrusone-cyrusone-atlanta-5ecb25b3) | CyrusOne | Operational | 120 |
| [ALIGNED DATA CENTERS ATL01](https://dchub.cloud/facilities/aligned-data-centers-atl01-8aac4489) | Aligned Data Centers |  |  |
| [CoreWeave Douglasville GA (Flexential)](https://dchub.cloud/facilities/coreweave-coreweave-douglasville-ga-flexential-001c28ec) | CoreWeave | Operational |  |
| [Flexential Atlanta - Douglasville 1](https://dchub.cloud/facilities/flexential-flexential-atlanta-douglasville-1-51fe9e13) | Flexential | Operational |  |
| [Flexential Atlanta - Douglasville 2](https://dchub.cloud/facilities/flexential-flexential-atlanta-douglasville-2-5f716b54) | Flexential | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Georgia](https://dchub.cloud/facilities/in/us/georgia).

## More on Douglasville

- [Douglasville DCPI score](https://dchub.cloud/dcpi/douglasville)
- [Douglasville market brief](https://dchub.cloud/markets/douglasville/brief)
- [Georgia data center market brief](https://dchub.cloud/states/georgia/brief)
- [Georgia data center tax incentives](https://dchub.cloud/states/georgia/data-center-incentives)

### Email me when the Douglasville DCPI verdict changes

Email me when Douglasville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Douglasville: 270 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=douglasville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=douglasville)

JSON: [/api/v1/markets/douglasville/deep-dive](https://dchub.cloud/api/v1/markets/douglasville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Douglasville","item":"https://dchub.cloud/markets/douglasville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Douglasville Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:01:38.848771+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/douglasville",
 "wordCount":243,
 "about":{"@type":"Place","name":"Douglasville"},
 "description":"Live data-center market analysis. DCPI score 22.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "douglasville", "name": "Douglasville Data Center Market — DC Hub", "description": "Live data-center market measurements for Douglasville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/douglasville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Douglasville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 270.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:45."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/douglasville#webpage", "url": "https://dchub.cloud/markets/douglasville", "name": "Douglasville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Douglasville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Douglasville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Douglasville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Douglasville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
