---
description: Is Des Moines a good data center market for power? DCPI verdict AVOID, score 31.6/100 (MISO), as of 2026-11-12. 823 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Des Moines data centers: power, grid and capacity | DC Hub"
---

# Des Moines data center market

Power availability in Des Moines: DCPI verdict AVOID, composite score 31.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Des Moines data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Des Moines market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.6/100**

MW, all listings**823**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Des Moines at a glance

Des Moines has 815 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (500 MW), Microsoft (300 MW) and Involta (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 815 |
| Total listed | 815 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Des Moines

DC Hub does not hold a lease-rate figure for this market yet.

The market is dominated by hyperscale and regional colocation operators, reflecting established competitive positioning. The presence of multiple top-tier operators signals sustained infrastructure investment in the region, though facility distribution remains concentrated among three players.

Together, these scores indicate that operators seeking to expand or deploy new capacity in Des Moines will encounter friction in securing additional power allocations, making the market unattractive for power-dependent growth strategies.

No recent deals are tracked in Des Moines' transaction registry, leaving current operator M&A activity and capacity expansion intentions opaque. Microsoft's publicly announced plans for regional facility development create localized infrastructure signals, yet this has not translated into tracked deal activity in Des Moines proper. Cologix's three-site footprint and Meta's seven-site presence establish established operational scale, but no visible consolidation, divestiture, or expansion transactions are documented at this time.

## Data centers in Des Moines

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Des Moines Data Center](https://dchub.cloud/facilities/microsoft-microsoft-des-moines-data-center-e40d31a9) | Microsoft | Operational | 300 |
| [Facebook Altoona Data Center 1](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-1-ab8673ba) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 2](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-2-b3050ab9) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 3](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-3-ded5d6ad) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 4](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-4-9d32d2fe) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 5](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-5-575d558e) | Meta | Operational | 100 |
| [Involta Des Moines](https://dchub.cloud/facilities/involta-involta-des-moines-b0cb576c) | Involta | Operational | 15 |
| [Altoona Meta Data Center](https://dchub.cloud/facilities/meta-altoona-meta-data-center-34e6130e) | Meta | Operational |  |
| [Aureon](https://dchub.cloud/facilities/aureon-aureon-b2c849bc) |  | Operational |  |
| [Aureon Downtown](https://dchub.cloud/facilities/aureon-network-services-aureon-downtown-b09f2711) | Aureon Network Services | Operational |  |
| [Azure Central US Iowa](https://dchub.cloud/facilities/microsoft-azure-central-us-iowa-7eaacb71) | Microsoft | Operational |  |
| [Cologix DES1 Des Moines](https://dchub.cloud/facilities/cologix-cologix-des1-des-moines-5fc2b099) | Cologix | Operational |  |
| [Cologix DSM1](https://dchub.cloud/facilities/cologix-inc-cologix-dsm1-c63f8aa7) | Cologix, Inc. | Operational |  |
| [Lightedge Des Moines 2](https://dchub.cloud/facilities/lightedge-des-moines-2-lightedge-des-moines-2-cc8bce14) |  | Operational |  |
| [Meta](https://dchub.cloud/facilities/meta-meta-87096557) |  | Operational |  |
| [Project Osmium](https://dchub.cloud/facilities/microsoft-project-osmium-fbc6f8e5) | Microsoft | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Iowa](https://dchub.cloud/facilities/in/us/iowa).

## More on Des Moines

- [Des Moines DCPI score](https://dchub.cloud/dcpi/des-moines)
- [Des Moines market brief](https://dchub.cloud/markets/des-moines/brief)
- [Iowa data center market brief](https://dchub.cloud/states/iowa/brief)
- [Iowa data center tax incentives](https://dchub.cloud/states/iowa/data-center-incentives)

### Email me when the Des Moines DCPI verdict changes

Email me when Des Moines's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Des Moines: 823 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=des-moines) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=des-moines)

JSON: [/api/v1/markets/des-moines/deep-dive](https://dchub.cloud/api/v1/markets/des-moines/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Des Moines","item":"https://dchub.cloud/markets/des-moines"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Des Moines Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:01:12.580587+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/des-moines",
 "wordCount":266,
 "about":{"@type":"Place","name":"Des Moines"},
 "description":"Live data-center market analysis. DCPI score 31.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "des-moines", "name": "Des Moines Data Center Market — DC Hub", "description": "Live data-center market measurements for Des Moines, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/des-moines", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Des Moines"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 823.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:10."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/des-moines#webpage", "url": "https://dchub.cloud/markets/des-moines", "name": "Des Moines data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Des Moines data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Des Moines market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Des Moines data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Des Moines market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
