description: Is Denver a good data center market for power? DCPI verdict CAUTION, score 52.1/100 (WECC), as of 2026-11-12. 471 MW tracked across all listings, unverified included (as of 2026-11-10). Grid, queue and deal context for 300+ markets.
title: "Denver data centers: power, grid and capacity | DC Hub"
---

# Denver data center market

Power availability in Denver: DCPI verdict CAUTION, composite score 52.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Denver data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Denver market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**52.1/100**

MW, all listings**471**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Denver at a glance

Denver has 237 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (60 MW), Equinix (40 MW) and Stream Data Centers (30 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 237 |
| Total listed | 237 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Denver

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Denver (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

The market has seen developer activity tied to Aurora-area expansion, and municipal engagement on data center policy remains active through Denver's advisory group structure and ongoing regulatory discussions.

This gap means that securing new capacity will depend heavily on point-of-delivery infrastructure readiness and interconnection queue position rather than raw generation scarcity. Developers and operators pursuing new or expanded projects must account for lead times in network upgrades and potential congestion in fiber routes serving key industrial corridors.

Flexential's dominant site count suggests established depth in the market, while DataBank and CoreSite each maintain smaller but meaningful footholds. The absence of announced acquisition, investment, or build activity in the tracked period offers no signal about future operator movement or consolidation appetite; deal flow silence does not indicate market weakness or retreat.

## Data centers in Denver

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Vantage Denver](https://dchub.cloud/facilities/vantage-data-centers-vantage-denver-7937c44f) | Vantage Data Centers | Operational | 60 |
| [Equinix DE Campus](https://dchub.cloud/facilities/equinix-equinix-de-campus-3b296ec4) | Equinix | Operational | 40 |
| [Stream Denver](https://dchub.cloud/facilities/stream-data-centers-stream-denver-fedd5754) | Stream Data Centers | Operational | 30 |
| [EdgeConneX Denver](https://dchub.cloud/facilities/edgeconnex-edgeconnex-denver-38812d04) | EdgeConneX | Operational | 25 |
| [Lincoln Rackhouse DEN1](https://dchub.cloud/facilities/lincoln-rackhouse-lincoln-rackhouse-den1-248e2100) | Lincoln Rackhouse | Operational | 25 |
| [T5@Denver](https://dchub.cloud/facilities/t5-t5denver-3ecb50b3) | T5 | Operational | 18 |
| [Flexential Denver 2](https://dchub.cloud/facilities/flexential-flexential-denver-2-6538e599) | Flexential | Operational | 12 |
| [Flexential Denver 1](https://dchub.cloud/facilities/flexential-flexential-denver-1-87416a49) | Flexential | Operational | 10 |
| [Evoque Denver 1](https://dchub.cloud/facilities/evoque-evoque-denver-1-febe7147) | Evoque | Operational | 9 |
| [DataBank DEN2](https://dchub.cloud/facilities/databank-databank-den2-faa196c6) | DataBank | Operational | 8 |
| [1500 Champa](https://dchub.cloud/facilities/ipi-partners-llc-1500-champa-e52693c4) | IPI Partners, LLC | Operational |  |
| [CoreSite - Denver (DE1)](https://dchub.cloud/facilities/coresite-coresite-denver-de1-cf10ccac) | CoreSite | Operational |  |
| [CoreSite - Denver (DE2)](https://dchub.cloud/facilities/coresite-coresite-denver-de2-0e3f5890) | CoreSite | Operational |  |
| [CyrusOne Aurora I](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-aurora-i-a8d48af8) | CyrusOne Inc. | Operational |  |
| [DataBank DEN1 Denver](https://dchub.cloud/facilities/databank-databank-den1-denver-201751d3) | DataBank | Operational |  |
| [DataBank Denver (DEN3)](https://dchub.cloud/facilities/databank-databank-denver-den3-026b0ce4) | DataBank | Operational |  |
| [DataBridge Sites Aurora](https://dchub.cloud/facilities/databridge-sites-databridge-sites-aurora-c14f9d03) | DataBridge Sites | Operational |  |
| [Digital Realty DEN1 Denver](https://dchub.cloud/facilities/digital-realty-digital-realty-den1-denver-067441ef) | Digital Realty | Operational |  |
| [EdgeConneX Denver CO](https://dchub.cloud/facilities/edgeconnex-edgeconnex-denver-co-42f12f0c) | EdgeConneX | Operational |  |
| [Equinix DE2 - Denver](https://dchub.cloud/facilities/equinix-equinix-de2-denver-14f23fb6) | Equinix | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Colorado](https://dchub.cloud/facilities/in/us/colorado).

## More on Denver

- [Denver DCPI score](https://dchub.cloud/dcpi/denver)
- [Denver market brief](https://dchub.cloud/markets/denver/brief)
- [Colorado data center market brief](https://dchub.cloud/states/colorado/brief)
- [Colorado data center tax incentives](https://dchub.cloud/states/colorado/data-center-incentives)

### Email me when the Denver DCPI verdict changes

Email me when Denver's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Denver: 471 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=denver) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=denver)

JSON: [/api/v1/markets/denver/deep-dive](https://dchub.cloud/api/v1/markets/denver/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Denver","item":"https://dchub.cloud/markets/denver"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Denver Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:01:35.040132+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/denver",
 "wordCount":231,
 "about":{"@type":"Place","name":"Denver"},
 "description":"Live data-center market analysis. DCPI score 52.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "denver", "name": "Denver Data Center Market — DC Hub", "description": "Live data-center market measurements for Denver, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/denver", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Denver"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 471.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 52.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:33."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:33.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:33."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/denver#webpage", "url": "https://dchub.cloud/markets/denver", "name": "Denver data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Denver data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Denver market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Denver data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Denver market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```