---
description: Is Washington, DC a good data center market for power? DCPI verdict AVOID, score 18.5/100 (PJM), as of 2026-11-18. Grid, queue and deal context for 300+ markets.
title: "Washington, DC data centers: power, grid and capacity | DC Hub"
---

# Washington, DC data center market

Power availability in Washington, DC: DCPI verdict AVOID, composite score 18.5 of 100, as of 2026-11-18. Source: DC Hub.

Data Center Market Deep-Dive · 265 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-18

**Question this page answers:** How much power is available in the Washington, DC data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Washington, DC market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

DCPI Score**18.5/100**

Verdict**AVOID**

## Colocation lease rates in Washington, DC

DC Hub does not hold a lease-rate figure for this market yet.

The market shows minimal recent transaction activity, with no deals tracked in the registry during the current measurement period. Operator concentration remains low, with no single player commanding dominant supply control.

The DCPI verdict of AVOID reflects structural headwinds on the power supply side. Together, these scores suggest that operators planning greenfield builds or significant expansions should expect material delays and higher costs to secure adequate supply.

No recent deals have been tracked, and the absence of M&A or lease transactions in the current window stands in contrast to sector-wide activity surge documented elsewhere.

## Data centers in Washington, DC

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CoreSite - Washington,DC (DC2)](https://dchub.cloud/facilities/coresite-coresite-washingtondc-dc2-fd8afe81) | CoreSite | Operational |  |
| [Lincoln Rackhouse Maryland](https://dchub.cloud/facilities/lincoln-rackhouse-lincoln-rackhouse-maryland-22a4fbed) | Lincoln Rackhouse | Operational |  |
| [Zayo Washington DC - 2100 M Street NW](https://dchub.cloud/facilities/zayo-group-zayo-washington-dc-2100-m-street-nw-0ef0e466) | Zayo Group | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [District of Columbia](https://dchub.cloud/facilities/in/us/district-of-columbia).

## More on Washington, DC

- [Washington, DC DCPI score](https://dchub.cloud/dcpi/dc)
- [Washington, DC market brief](https://dchub.cloud/markets/dc/brief)
- [District of Columbia data center market brief](https://dchub.cloud/states/district-of-columbia/brief)

### Email me when the Washington, DC DCPI verdict changes

Email me when Washington, DC's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Washington, DC market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=dc) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=dc)

JSON: [/api/v1/markets/dc/deep-dive](https://dchub.cloud/api/v1/markets/dc/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Dc","item":"https://dchub.cloud/markets/dc"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Washington, DC Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:35:58.601044+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/dc",
 "wordCount":265,
 "about":{"@type":"Place","name":"Washington, DC"},
 "description":"Live data-center market analysis. DCPI score 18.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "dc", "name": "Washington, DC Data Center Market — DC Hub", "description": "Live data-center market measurements for Washington, DC, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/dc", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Washington, DC"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 18.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-18T00:38:57."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-18T00:38:57.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-18T00:38:57."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "FAQPage", "url": "https://dchub.cloud/markets/dc", "mainEntity": [{"@type": "Question", "name": "Is Washington, DC a good market to build a data center right now?", "acceptedAnswer": {"@type": "Answer", "text": "Power availability in Washington, DC: DCPI verdict AVOID, composite score 18.5 of 100, as of 2026-11-18. Source: DC Hub."}}]}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/dc#webpage", "url": "https://dchub.cloud/markets/dc", "name": "Washington, DC data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Washington, DC data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Washington, DC market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Washington, DC data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Washington, DC market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
