description: Is Culpeper a good data center market for power? DCPI verdict AVOID, score 22.9/100 (PJM), as of 2026-11-12. 216 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Culpeper data centers: power, grid and capacity | DC Hub"
---

# Culpeper data center market

Power availability in Culpeper: DCPI verdict AVOID, composite score 22.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 152 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Culpeper data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Culpeper market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.9/100**

MW, all listings**216**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Culpeper at a glance

Culpeper has 216 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are EdgeCore Digital Infrastructure (216 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 216 |
| Total listed | 216 |

## Developers building or planning in Culpeper

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| EdgeCore Digital Infrastructure | 216 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Culpeper

DC Hub does not hold a lease-rate figure for this market yet.

Recent security incidents at an active construction site underscore ongoing build-out activity in the region. The market's operator base remains concentrated, with EdgeCore Digital Infrastructure representing the only other tracked operator beyond Equinix's footprint.

Deal flow in Culpeper remains dormant—no recent transactions are tracked.

## Data centers in Culpeper

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [EdgeCore Culpeper Campus](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-culpeper-campus-c11062c2) | EdgeCore Digital Infrastructure | Under Construction | 216 |
| [Equinix CU1/CU2/CU3/CU4 - Culpeper](https://dchub.cloud/facilities/equinix-equinix-cu1cu2cu3cu4-culpeper-a374a978) | Equinix | Operational |  |
| [Equinix CU2](https://dchub.cloud/facilities/equinix-equinix-cu2-995e97f2) | Equinix | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Culpeper

- [Culpeper DCPI score](https://dchub.cloud/dcpi/culpeper)
- [Culpeper market brief](https://dchub.cloud/markets/culpeper/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Culpeper DCPI verdict changes

Email me when Culpeper's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Culpeper: 216 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=culpeper) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=culpeper)

JSON: [/api/v1/markets/culpeper/deep-dive](https://dchub.cloud/api/v1/markets/culpeper/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Culpeper","item":"https://dchub.cloud/markets/culpeper"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Culpeper Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T09:01:03.179313+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/culpeper",
 "wordCount":152,
 "about":{"@type":"Place","name":"Culpeper"},
 "description":"Live data-center market analysis. DCPI score 22.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "culpeper", "name": "Culpeper Data Center Market — DC Hub", "description": "Live data-center market measurements for Culpeper, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/culpeper", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Culpeper"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 216.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:12."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:12.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:12."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/culpeper#webpage", "url": "https://dchub.cloud/markets/culpeper", "name": "Culpeper data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Culpeper data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Culpeper market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Culpeper data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Culpeper market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```