---
description: Is Council Bluffs a good data center market for power? DCPI verdict AVOID, score 31.9/100 (MISO), as of 2026-11-12. 1,110 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Council Bluffs data centers: power, grid and capacity | DC Hub"
---

# Council Bluffs data center market

Power availability in Council Bluffs: DCPI verdict AVOID, composite score 31.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 208 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Council Bluffs data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Council Bluffs market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.9/100**

MW, all listings**1,110**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Council Bluffs at a glance

Council Bluffs has 850 MW operational and 60 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (910 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 850 |
| Under construction | 60 |
| Total listed | 910 |

## Developers building or planning in Council Bluffs

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Google | 60 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Council Bluffs

DC Hub does not hold a lease-rate figure for this market yet.

The market shows moderate consolidation with two single-facility operators (GABLE CORP and STREAMLINE UTILITY HOLDINGS) alongside the dominant two. Structural work on a 200 MW campus reached topping-out phase recently, signaling active construction momentum in the region.

This combination suggests that new entrants or existing operators seeking incremental capacity should expect limited availability and potentially longer lead times for power commitments in Council Bluffs.

No recent deals are tracked in the registry, leaving operator acquisition and divestment dynamics opaque. The stability of the current operator footprint—Google and CyrusOne maintaining equal facility counts alongside two smaller single-asset operators—offers no clear signals regarding consolidation appetite, expansion timing, or third-party capital entry.

Power supply tightness should inform any build or expansion planning for Council Bluffs over the near term.

## Data centers in Council Bluffs

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Cloud us-central1 (Iowa)](https://dchub.cloud/facilities/google-google-cloud-us-central1-iowa-abab4352) | Google | Operational | 500 |
| [Google Council Bluffs Data Center](https://dchub.cloud/facilities/google-google-council-bluffs-data-center-e6a28ba0) | Google | Operational | 350 |
| [Google Council Bluffs Building 5](https://dchub.cloud/facilities/google-google-council-bluffs-building-5-100c1666) | Google | Under Construction | 60 |
| [CyrusOne Council Bluffs IA](https://dchub.cloud/facilities/cyrusone-cyrusone-council-bluffs-ia-20595673) | CyrusOne | Operational |  |
| [CyrusOne OCB1 Council Bluffs](https://dchub.cloud/facilities/cyrusone-cyrusone-ocb1-council-bluffs-8d23ad56) | CyrusOne | Operational |  |
| [Google Council Bluffs Iowa](https://dchub.cloud/facilities/google-google-council-bluffs-iowa-4016dad9) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Iowa](https://dchub.cloud/facilities/in/us/iowa).

## More on Council Bluffs

- [Council Bluffs DCPI score](https://dchub.cloud/dcpi/council-bluffs)
- [Council Bluffs market brief](https://dchub.cloud/markets/council-bluffs/brief)
- [Iowa data center market brief](https://dchub.cloud/states/iowa/brief)
- [Iowa data center tax incentives](https://dchub.cloud/states/iowa/data-center-incentives)

### Email me when the Council Bluffs DCPI verdict changes

Email me when Council Bluffs's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Council Bluffs: 1,110 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=council-bluffs) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=council-bluffs)

JSON: [/api/v1/markets/council-bluffs/deep-dive](https://dchub.cloud/api/v1/markets/council-bluffs/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Council Bluffs","item":"https://dchub.cloud/markets/council-bluffs"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Council Bluffs Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T05:24:29.103029+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/council-bluffs",
 "wordCount":208,
 "about":{"@type":"Place","name":"Council Bluffs"},
 "description":"Live data-center market analysis. DCPI score 31.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "council-bluffs", "name": "Council Bluffs Data Center Market — DC Hub", "description": "Live data-center market measurements for Council Bluffs, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/council-bluffs", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Council Bluffs"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1110.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:16."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/council-bluffs#webpage", "url": "https://dchub.cloud/markets/council-bluffs", "name": "Council Bluffs data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Council Bluffs data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Council Bluffs market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Council Bluffs data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Council Bluffs market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
