---
description: Is Copenhagen a good data center market for power? DCPI verdict AVOID, score 30.1/100 (NORDPOOL), as of 2026-11-12. 14 MW tracked across all listings, unverified included (as of 2026-11-08). Grid, queue and deal context for 300+ markets.
title: "Copenhagen data centers: power, grid and capacity | DC Hub"
---

# Copenhagen data center market

Power availability in Copenhagen: DCPI verdict AVOID, composite score 30.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Copenhagen data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Copenhagen market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.1/100**

MW, all listings**14**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Copenhagen at a glance

Copenhagen has 14 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (14 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 14 |
| Total listed | 14 |

## Developers building or planning in Copenhagen

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Amazon Web Services |  |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Copenhagen

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty commands the largest footprint with four sites, while Telia Company and AtlasEdge each operate two facilities. The market shows no recent deal activity in the tracked dataset, suggesting a period of consolidation rather than expansion.

This is not a scarcity crisis but rather a saturation condition: the market has consumed most of its readily deployable power envelope, and further additions require either demand destruction, grid upgrades, or scheduled waiting periods.

Operator consolidation suggests maturity in the Copenhagen ecosystem. The presence of four Digital Realty sites alongside Telia's dual footprint indicates that the largest players have already staked major positions. This contrasts with markets experiencing active M&A, where deal flow typically signals confidence in new power pathways.

## Data centers in Copenhagen

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty Copenhagen CPH2](https://dchub.cloud/facilities/digital-realty-digital-realty-copenhagen-cph2-f726c2f1) | Digital Realty | Operational | 14 |
| [AWS Europe (Denmark 2nd)](https://dchub.cloud/facilities/amazon-web-services-aws-europe-denmark-2nd-0c3a093b) | Amazon Web Services | Planned |  |
| [CPH01](https://dchub.cloud/facilities/microsoft-cph01-89865ab0) | Microsoft | Operational |  |
| [Copenhagen](https://dchub.cloud/facilities/digital-realty-copenhagen-b1c8064e) | Digital Realty | Operational |  |
| [Digital Realty CPH1 Copenhagen](https://dchub.cloud/facilities/digital-realty-digital-realty-cph1-copenhagen-873529d1) | Digital Realty | Operational |  |
| [GlobalConnect Vesterbro (CPH2)](https://dchub.cloud/facilities/globalconnect-group-globalconnect-vesterbro-cph2-6bcbf904) | GlobalConnect Group | Operational |  |
| [Interxion CPH02](https://dchub.cloud/facilities/interxion-cph02-65cdf2c5) |  | Operational |  |
| [Interxion CPH03](https://dchub.cloud/facilities/interxion-cph03-a730447c) |  | Operational |  |
| [Vaultica Data Centers \| COP01](https://dchub.cloud/facilities/stack-emea-stack-emea-cop01-06c11fef) | STACK EMEA | Operational |  |
| [atNorth DEN01 Copenhagen](https://dchub.cloud/facilities/atnorth-atnorth-den01-copenhagen-323b3b11) | atNorth | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Denmark](https://dchub.cloud/facilities/in/dk).

## More on Copenhagen

- [Copenhagen DCPI score](https://dchub.cloud/dcpi/copenhagen)
- [Copenhagen market brief](https://dchub.cloud/markets/copenhagen/brief)

### Email me when the Copenhagen DCPI verdict changes

Email me when Copenhagen's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Copenhagen: 14 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=copenhagen) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=copenhagen)

JSON: [/api/v1/markets/copenhagen/deep-dive](https://dchub.cloud/api/v1/markets/copenhagen/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Copenhagen","item":"https://dchub.cloud/markets/copenhagen"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Copenhagen Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T05:24:21.503926+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/copenhagen",
 "wordCount":256,
 "about":{"@type":"Place","name":"Copenhagen"},
 "description":"Live data-center market analysis. DCPI score 30.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "copenhagen", "name": "Copenhagen Data Center Market — DC Hub", "description": "Live data-center market measurements for Copenhagen, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/copenhagen", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Copenhagen"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 14.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:48."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/copenhagen#webpage", "url": "https://dchub.cloud/markets/copenhagen", "name": "Copenhagen data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Copenhagen data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Copenhagen market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Copenhagen data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Copenhagen market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
