---
description: Is Commack a good data center market for power? DCPI verdict CAUTION, score 49.3/100 (NYISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Commack data centers: power, grid and capacity | DC Hub"
---

# Commack data center market

Power availability in Commack: DCPI verdict CAUTION, composite score 49.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Commack data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Commack market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Commack

DC Hub does not hold a lease-rate figure for this market yet.

The market's limited operator base and absence of recent transaction tracking suggest a small, established footprint with minimal current M&A activity. No recent deals have been tracked in this market.

This combination means new power may technically be available regionally, but getting it to individual sites faces real obstacles. Operators considering expansion or new builds should expect grid interconnection, transmission availability, or local distribution to require detailed feasibility work rather than straightforward power procurement.

With no recent tracked deals, Commack shows a quiet operator landscape. The two-facility market is anchored by established operators rather than acquisition-focused entrants or consolidators.

Near-term power additions to Commack will likely depend on whether local transmission and distribution upgrades can be sequenced ahead of operator expansion plans.

## More on Commack

- [Commack DCPI score](https://dchub.cloud/dcpi/commack)
- [Commack market brief](https://dchub.cloud/markets/commack/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Commack DCPI verdict changes

Email me when Commack's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Commack market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=commack) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=commack)

JSON: [/api/v1/markets/commack/deep-dive](https://dchub.cloud/api/v1/markets/commack/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Commack","item":"https://dchub.cloud/markets/commack"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Commack Data Center Market Deep-Dive",
 "datePublished":"2026-11-08T05:24:04.418366+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/commack",
 "wordCount":254,
 "about":{"@type":"Place","name":"Commack"},
 "description":"Live data-center market analysis. DCPI score 49.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "commack", "name": "Commack Data Center Market — DC Hub", "description": "Live data-center market measurements for Commack, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/commack", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Commack"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:53."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:53.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:53."}], "dateModified": "2026-11-08", "temporalCoverage": "2026-11-08"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/commack#webpage", "url": "https://dchub.cloud/markets/commack", "name": "Commack data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Commack data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Commack market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Commack data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Commack market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
