# Columbus data center market

Power availability in Columbus: DCPI verdict AVOID, composite score 17.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 226 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Columbus data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Columbus market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**17.3/100**

MW, all listings**2,111**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Columbus at a glance

Columbus has 576 MW operational, 100 MW under construction and 500 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Stargate (OpenAI/SoftBank/Oracle) (500 MW), Google (350 MW) and Amazon Web Services (200 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 576 |
| Under construction | 100 |
| Planned | 500 |
| Total listed | 1,176 |

## Developers building or planning in Columbus

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Stargate (OpenAI/SoftBank/Oracle) |  | 500 |
| Google | 100 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Columbus

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Anchored on JLL North America Data Center Report Midyear 2025 (1-5 MW, H1 2025): Columbus (figure on paid plans) plus ~9% JLL-reported NA rent growth to 2026; held below Chicago (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)).

The market reflects established hyperscaler engagement but with limited recent transactional activity—no new deals have been tracked in the current period.

The verdict reflects grid realities, not demand weakness.

Deal flow remains quiet. The tracked market recorded no recent transactions, and operator concentration skews toward hyperscalers rather than wholesale colocation vendors.

## Data centers in Columbus

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Stargate Ohio Campus](https://dchub.cloud/facilities/stargate-openaisoftbankoracle-stargate-ohio-campus-acf2f8da) | Stargate (OpenAI/SoftBank/Oracle) | Planned | 500 |
| [Google Columbus Data Center](https://dchub.cloud/facilities/google-google-columbus-data-center-f9e74102) | Google | Operational | 250 |
| [AWS US-East-2 Columbus Campus](https://dchub.cloud/facilities/amazon-web-services-aws-us-east-2-columbus-campus-5f80bd89) | Amazon Web Services | Operational | 200 |
| [Google Columbus Building 2](https://dchub.cloud/facilities/google-google-columbus-building-2-1f4cb316) | Google | Under Construction | 100 |
| [Compass Columbus](https://dchub.cloud/facilities/compass-datacenters-compass-columbus-65fdd8df) | Compass Datacenters | Operational | 90 |
| [Cologix Columbus](https://dchub.cloud/facilities/cologix-cologix-columbus-56ee5e59) | Cologix | Operational | 28 |
| [Involta Columbus](https://dchub.cloud/facilities/involta-involta-columbus-8c3a742f) | Involta | Operational | 8 |
| [180 E Broad St.](https://dchub.cloud/facilities/hexion-building-180-e-broad-st-bbb1b779) | Hexion Building | Operational |  |
| [AWS Ohio Columbus](https://dchub.cloud/facilities/amazon-web-services-aws-ohio-columbus-80d85b40) | Amazon Web Services | Operational |  |
| [AWS US East 2 (Ohio)](https://dchub.cloud/facilities/amazon-web-services-aws-us-east-2-ohio-ca1a1ea4) | Amazon Web Services | Operational |  |
| [Amazon New Albany: Jug and Beach Road](https://dchub.cloud/facilities/amazon-new-albany-jug-and-beach-road-amazon-new-albany-jug-and-beach-road-8256af41) |  | Operational |  |
| [Amazon Web Services CMH50](https://dchub.cloud/facilities/amazon-web-services-amazon-web-services-cmh50-8eb0bf24) | Amazon Web Services | Operational |  |
| [Amazon Web Services CMH53](https://dchub.cloud/facilities/amazon-web-services-amazon-web-services-cmh53-eeeb7938) | Amazon Web Services | Operational |  |
| [Amazon Web Services CMH62](https://dchub.cloud/facilities/amazon-web-services-amazon-web-services-cmh62-682ae87b) | Amazon Web Services | Operational |  |
| [Bresco Broadband Data Center](https://dchub.cloud/facilities/bresco-broadband-bresco-broadband-data-center-f5e155a5) | Bresco Broadband | Operational |  |
| [CENTRA CMH01 - Columbus Ohio (180 E Broad)](https://dchub.cloud/facilities/centra-digital-interconnect-centra-cmh01-columbus-ohio-180-e-broad-deaec8fc) | CENTRA Digital Interconnect | Operational |  |
| [Citynet Columbus](https://dchub.cloud/facilities/citynet-citynet-columbus-1a3ddf79) | Citynet | Operational |  |
| [Cogent Columbus](https://dchub.cloud/facilities/cogent-communications-inc-cogent-columbus-a4240e47) | Cogent Communications, Inc. | Operational |  |
| [Cogent Columbus 2](https://dchub.cloud/facilities/cogent-communications-inc-cogent-columbus-2-b9e8ec72) | Cogent Communications, Inc. | Operational |  |
| [Cologix COL1](https://dchub.cloud/facilities/cologix-inc-cologix-col1-b20ef60e) | Cologix, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Ohio](https://dchub.cloud/facilities/in/us/ohio).

## More on Columbus

- [Columbus DCPI score](https://dchub.cloud/dcpi/columbus)
- [Columbus market brief](https://dchub.cloud/markets/columbus/brief)
- [Ohio data center market brief](https://dchub.cloud/states/ohio/brief)
- [Ohio data center tax incentives](https://dchub.cloud/states/ohio/data-center-incentives)

### Email me when the Columbus DCPI verdict changes

Email me when Columbus's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Columbus: 2,111 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=columbus) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=columbus)

JSON: [/api/v1/markets/columbus/deep-dive](https://dchub.cloud/api/v1/markets/columbus/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Columbus","item":"https://dchub.cloud/markets/columbus"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Columbus Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:01:16.606869+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/columbus",
 "wordCount":226,
 "about":{"@type":"Place","name":"Columbus"},
 "description":"Live data-center market analysis. DCPI score 17.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "columbus", "name": "Columbus Data Center Market — DC Hub", "description": "Live data-center market measurements for Columbus, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/columbus", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Columbus"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 2111.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 17.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:24."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:24.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:24."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/columbus#webpage", "url": "https://dchub.cloud/markets/columbus", "name": "Columbus data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Columbus data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Columbus market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Columbus data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Columbus market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```