description: Is Coeur d'Alene a good data center market for power? DCPI verdict AVOID, score 33.3/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Coeur d'Alene data centers: power, grid and capacity | DC Hub"
---

# Coeur d'Alene data center market

Power availability in Coeur d'Alene: DCPI verdict AVOID, composite score 33.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 265 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Coeur d'Alene data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Coeur d'Alene market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**33.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Coeur d'Alene

DC Hub does not hold a lease-rate figure for this market yet.

Coeur d'Alene hosts four tracked facilities operated by Neutron LLC, U.S. Bank Coeur d'Alene Data Center, and Ziply Fiber, with no megawatt totals reported across the tracked sites. Neither metric signals acute scarcity, but the combination defines the operational environment.

The DCPI verdict of AVOID applies specifically to power procurement for new capacity. This is not a statement about the market's size or strategic value—it reflects the tangible costs and timeline delays that operators and developers would face when securing new power supply.

No recent deals are tracked in Coeur d'Alene's registry. The four operators maintain discrete presences, and without deal flow, operator consolidation or capacity expansion through M&A is not visible. These regional developments reflect demand for data center infrastructure in Idaho, but have not yet translated into transaction activity or announced expansion within Coeur d'Alene itself.

Power supply remains the key variable for any facility planning in this market. Prospective operators should model interconnection timelines and transmission capacity carefully before committing to site selection or expansion strategies in Coeur d'Alene.

## Data centers in Coeur d'Alene

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Neutron - Coeur d'Alene](https://dchub.cloud/facilities/neutron-llc-neutron-coeur-dalene-66606c9e) | Neutron LLC | Operational |  |
| [U S BANK COEUR D'ALENE DATA CENTER](https://dchub.cloud/facilities/u-s-bank-coeur-dalene-data-center-38f8b020) |  |  |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Idaho](https://dchub.cloud/facilities/in/us/idaho).

## More on Coeur d'Alene

- [Coeur d'Alene DCPI score](https://dchub.cloud/dcpi/coeur-d'alene)
- [Coeur d'Alene market brief](https://dchub.cloud/markets/coeur-d'alene/brief)
- [Idaho data center market brief](https://dchub.cloud/states/idaho/brief)
- [Idaho data center tax incentives](https://dchub.cloud/states/idaho/data-center-incentives)

### Email me when the Coeur d'Alene DCPI verdict changes

Email me when Coeur d'Alene's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Coeur d'Alene market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=coeur-d'alene) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=coeur-d'alene)

JSON: [/api/v1/markets/coeur-d'alene/deep-dive](https://dchub.cloud/api/v1/markets/coeur-d'alene/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Coeur D'Alene","item":"https://dchub.cloud/markets/coeur-d'alene"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Coeur d'Alene Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:55:58.015669+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/coeur-d'alene",
 "wordCount":265,
 "about":{"@type":"Place","name":"Coeur d'Alene"},
 "description":"Live data-center market analysis. DCPI score 33.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "coeur-d'alene", "name": "Coeur d'Alene Data Center Market — DC Hub", "description": "Live data-center market measurements for Coeur d'Alene, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/coeur-d'alene", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Coeur d'Alene"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 33.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:59."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:59.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:59."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/coeur-d'alene#webpage", "url": "https://dchub.cloud/markets/coeur-d'alene", "name": "Coeur d'Alene data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Coeur d'Alene data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Coeur d'Alene market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Coeur d'Alene data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Coeur d'Alene market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```