---
description: Is Clarksville a good data center market for power? DCPI verdict AVOID, score 28.7/100 (TVA), as of 2026-11-12. 160 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Clarksville data centers: power, grid and capacity | DC Hub"
---

# Clarksville data center market

Power availability in Clarksville: DCPI verdict AVOID, composite score 28.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 235 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Clarksville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Clarksville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**28.7/100**

MW, all listings**160**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Clarksville at a glance

Clarksville has 160 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (160 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 160 |
| Total listed | 160 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Clarksville

DC Hub does not hold a lease-rate figure for this market yet.

Clarksville's tracked data center footprint stands at 160 MW across eight facilities, with Google operating four sites (three under the Google brand, one as Google LLC) and three other operators—FOXMAN LLC, TECFUSIONS CLARKSVILLE LLC, and one unspecified entity—each managing single locations. The market remains fragmented by operator, with no dominant player controlling more than half the tracked capacity. No recent deal activity has been recorded in the tracked dataset.

Together, these scores suggest that securing incremental grid capacity for new or expanded facilities would face meaningful obstacles, making this an unfavorable environment for power-contingent growth in the near term.

This pattern—using distributed generation to bypass transmission limitations—is consistent with markets where grid augmentation is difficult or slow.

## Data centers in Clarksville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [SPC3A](https://dchub.cloud/facilities/google-spc3a-d83d3d04) | Google | Operational | 80 |
| [SPC4A](https://dchub.cloud/facilities/google-spc4a-2660c013) | Google | Operational | 80 |
| [Google Montgomery Data Center](https://dchub.cloud/facilities/google-google-montgomery-data-center-ebc320e1) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Tennessee](https://dchub.cloud/facilities/in/us/tennessee).

## More on Clarksville

- [Clarksville DCPI score](https://dchub.cloud/dcpi/clarksville)
- [Clarksville market brief](https://dchub.cloud/markets/clarksville/brief)
- [Tennessee data center market brief](https://dchub.cloud/states/tennessee/brief)
- [Tennessee data center tax incentives](https://dchub.cloud/states/tennessee/data-center-incentives)

### Email me when the Clarksville DCPI verdict changes

Email me when Clarksville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Clarksville: 160 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=clarksville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=clarksville)

JSON: [/api/v1/markets/clarksville/deep-dive](https://dchub.cloud/api/v1/markets/clarksville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Clarksville","item":"https://dchub.cloud/markets/clarksville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Clarksville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:51:15.895511+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/clarksville",
 "wordCount":235,
 "about":{"@type":"Place","name":"Clarksville"},
 "description":"Live data-center market analysis. DCPI score 28.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "clarksville", "name": "Clarksville Data Center Market — DC Hub", "description": "Live data-center market measurements for Clarksville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/clarksville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Clarksville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 160.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 28.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:58."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:58.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:58."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/clarksville#webpage", "url": "https://dchub.cloud/markets/clarksville", "name": "Clarksville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Clarksville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Clarksville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Clarksville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Clarksville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
