---
description: Is Chennai a good data center market for power? DCPI verdict AVOID, score 16.2/100 (POSOCO), as of 2026-11-12. 73 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Chennai data centers: power, grid and capacity | DC Hub"
---

# Chennai data center market

Power availability in Chennai: DCPI verdict AVOID, composite score 16.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 301 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Chennai data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Chennai market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**16.2/100**

MW, all listings**73**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Chennai

DC Hub does not hold a lease-rate figure for this market yet.

Atria Convergence Technologies leads with four facilities, followed by STT GDC and Digital Realty at three each, and AdaniConneX with two. The market's four-operator concentration reflects a maturing but still fragmented supply base relative to India's larger metros.

The DCPI verdict of AVOID reflects structural power supply challenges that will constrain new capacity additions. Together, these metrics indicate that sourcing reliable, dedicated power for incremental MW capacity will require either long-lead infrastructure buildouts or creative offtake arrangements outside conventional utility channels.

Recent announced projects underscore active pipeline momentum despite these supply headwinds. CapitaLand announced a 53 MW facility before end-of-year, representing a 73% expansion of tracked supply from a single player. L&T broke ground on a second 52 MW Chennai facility to support its Vyoma cloud unit, signaling captive capacity deployment by major conglomerates. A Vyoma.AI lease deal was recorded but terms remain unspecified.

## Data centers in Chennai

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Azure South India Chennai](https://dchub.cloud/facilities/microsoft-azure-south-india-chennai-fa564055) | Microsoft | Operational |  |
| [CtrlS Chennai DC](https://dchub.cloud/facilities/ctrls-ctrls-chennai-dc-69d3944b) | CtrlS | Operational |  |
| [Digital Realty MAA1 Chennai](https://dchub.cloud/facilities/digital-realty-digital-realty-maa1-chennai-52e43c90) | Digital Realty | Operational |  |
| [Government Data Centre](https://dchub.cloud/facilities/government-data-centre-fbd7c8f3) |  | Operational |  |
| [NIXI Chennai SIFY](https://dchub.cloud/facilities/national-internet-exchange-of-india-nixi-chennai-sify-1e080f3d) | National Internet Exchange of India | Operational |  |
| [NIXI Chennai STT](https://dchub.cloud/facilities/national-internet-exchange-of-india-nixi-chennai-stt-96822ea0) | National Internet Exchange of India | Operational |  |
| [NTT Chennai DC1](https://dchub.cloud/facilities/ntt-ntt-chennai-dc1-75e6e618) | NTT | Operational |  |
| [Niss Broadband-Chennai](https://dchub.cloud/facilities/niss-internet-services-pvt-ltd-niss-broadband-chennai-194b33f6) | Niss Internet Services Pvt. Ltd. | Operational |  |
| [Powergrid Chennai](https://dchub.cloud/facilities/powergrid-teleservices-limited-powergrid-chennai-8e310ba3) | Powergrid Teleservices Limited | Operational |  |
| [STT GDC Chennai Campus](https://dchub.cloud/facilities/stt-gdc-stt-gdc-chennai-campus-56035df7) | STT GDC | Operational |  |
| [STTGDC CHN1](https://dchub.cloud/facilities/st-telemedia-global-data-centres-stt-gdc-stt-chennai-1-9fd8af16) | ST Telemedia Global Data Centres (STT GDC) | Operational |  |
| [Sify Infinit Spaces Limited](https://dchub.cloud/facilities/sify-technologies-limited-sify-infinit-spaces-limited-a2c38af7) | Sify Technologies Limited | Operational |  |
| [Sify Tidel-DC- Chennai](https://dchub.cloud/facilities/sify-technologies-limited-sify-tidel-dc-chennai-eb9a6d1c) | Sify Technologies Limited | Operational |  |
| [TATA Communications Chennai](https://dchub.cloud/facilities/tata-communications-ltd-tata-communications-chennai-dcb954a5) | TATA Communications Ltd | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [India](https://dchub.cloud/facilities/in/in).

## More on Chennai

- [Chennai DCPI score](https://dchub.cloud/dcpi/chennai)
- [Chennai market brief](https://dchub.cloud/markets/chennai/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Chennai DCPI verdict changes

Email me when Chennai's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Chennai: 73 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=chennai) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=chennai)

JSON: [/api/v1/markets/chennai/deep-dive](https://dchub.cloud/api/v1/markets/chennai/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Chennai","item":"https://dchub.cloud/markets/chennai"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Chennai Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:50:42.975622+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/chennai",
 "wordCount":301,
 "about":{"@type":"Place","name":"Chennai"},
 "description":"Live data-center market analysis. DCPI score 16.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "chennai", "name": "Chennai Data Center Market — DC Hub", "description": "Live data-center market measurements for Chennai, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/chennai", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Chennai"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 73.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 16.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:59."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:59.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:59."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/chennai#webpage", "url": "https://dchub.cloud/markets/chennai", "name": "Chennai data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Chennai data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Chennai market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Chennai data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Chennai market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
