description: Is Chattanooga a good data center market for power? DCPI verdict AVOID, score 29.5/100 (TVA), as of 2026-11-12. 12 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Chattanooga data centers: power, grid and capacity | DC Hub"
---

# Chattanooga data center market

Power availability in Chattanooga: DCPI verdict AVOID, composite score 29.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 227 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Chattanooga data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Chattanooga market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**29.5/100**

MW, all listings**12**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Chattanooga at a glance

Chattanooga has 12 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DC BLOX (12 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 12 |
| Total listed | 12 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Chattanooga

DC Hub does not hold a lease-rate figure for this market yet.

Chattanooga's tracked data center footprint spans five facilities across a operator base including DC BLOX, Google, and Peace Communications. One tracked site reports power consumption data, though market-wide capacity figures remain undisclosed. Recent deal activity in this market has not been tracked.

These scores suggest that power procurement will require either significant capital investment in local infrastructure or substantial delays in project timelines.

Operator concentration remains moderate, with no single entity dominating the five tracked sites. DC BLOX holds two facilities (direct entity and parent company listed separately), Google holds two (similarly listed), and Peace Communications holds one. The absence of recent tracked deals does not characterize market momentum; rather, it reflects the current state of recorded transaction activity. Broader regional interest in data center development is evident from proposed large-scale projects, though these remain subject to local permitting and community debate.

## Data centers in Chattanooga

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DC BLOX Chattanooga](https://dchub.cloud/facilities/dc-blox-dc-blox-chattanooga-01b0fc04) | DC BLOX | Operational | 12 |
| [Google Jackson County Data Center](https://dchub.cloud/facilities/google-google-jackson-county-data-center-1cdcb9f5) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Tennessee](https://dchub.cloud/facilities/in/us/tennessee).

## More on Chattanooga

- [Chattanooga DCPI score](https://dchub.cloud/dcpi/chattanooga)
- [Chattanooga market brief](https://dchub.cloud/markets/chattanooga/brief)
- [Tennessee data center market brief](https://dchub.cloud/states/tennessee/brief)
- [Tennessee data center tax incentives](https://dchub.cloud/states/tennessee/data-center-incentives)

### Email me when the Chattanooga DCPI verdict changes

Email me when Chattanooga's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Chattanooga: 12 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=chattanooga) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=chattanooga)

JSON: [/api/v1/markets/chattanooga/deep-dive](https://dchub.cloud/api/v1/markets/chattanooga/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Chattanooga","item":"https://dchub.cloud/markets/chattanooga"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Chattanooga Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:50:33.450100+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/chattanooga",
 "wordCount":227,
 "about":{"@type":"Place","name":"Chattanooga"},
 "description":"Live data-center market analysis. DCPI score 29.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "chattanooga", "name": "Chattanooga Data Center Market — DC Hub", "description": "Live data-center market measurements for Chattanooga, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/chattanooga", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Chattanooga"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 12.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 29.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:20."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:20.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:20."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/chattanooga#webpage", "url": "https://dchub.cloud/markets/chattanooga", "name": "Chattanooga data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Chattanooga data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Chattanooga market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Chattanooga data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Chattanooga market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```