description: Is Charlotte a good data center market for power? DCPI verdict AVOID, score 30.2/100 (SERC), as of 2026-11-12. 16 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Charlotte data centers: power, grid and capacity | DC Hub"
---

# Charlotte data center market

Power availability in Charlotte: DCPI verdict AVOID, composite score 30.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 281 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Charlotte data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Charlotte market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.2/100**

MW, all listings**16**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Charlotte at a glance

Charlotte has 16 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Flexential (8 MW) and T5 (8 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 16 |
| Total listed | 16 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Charlotte

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Charlotte-Raleigh (combined market) (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

No recent deal activity has been recorded in the market.

Together, these scores suggest that operators pursuing expansion or new builds will face elevated lead times and potentially higher costs to source and interconnect new power supply. The combination does not reflect demand weakness but rather a mismatch between available grid capacity and site-level appetite for additional megawatts.

Operator consolidation is concentrated among regional and national players. Flexential's nine-site footprint establishes it as the dominant operator by facility count, though the aggregate 16 MW base remains modest relative to major U.S. metros. In adjacent North Carolina markets, WhiteFiber announced acquisition of two development-stage sites in late 2025, indicating that greenfield and repositioning activity continues in the state, though not visibly in Charlotte's tracked set.

Power infrastructure development remains the limiting variable for growth. Any material acceleration in Charlotte capacity will likely depend on whether utility-scale power additions—whether through grid reinforcement, generation capacity, or distributed supply agreements—can narrow the gap between buildable MW and grid availability.

## Data centers in Charlotte

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Flexential Charlotte](https://dchub.cloud/facilities/flexential-flexential-charlotte-84bc1627) | Flexential | Operational | 8 |
| [T5@Charlotte](https://dchub.cloud/facilities/t5-t5charlotte-c8313c46) | T5 | Operational | 8 |
| [CENTRA CLT01 - Charlotte NC (701 E Trade)](https://dchub.cloud/facilities/centra-digital-interconnect-centra-clt01-charlotte-nc-701-e-trade-1e534821) | CENTRA Digital Interconnect | Operational |  |
| [Carolina Internet / CaroNet](https://dchub.cloud/facilities/caronet-carolina-internet-caronet-9f5de405) | CaroNet | Operational |  |
| [Carolina Internet / CaroNet XB](https://dchub.cloud/facilities/caronet-carolina-internet-caronet-xb-0dd04b0c) | CaroNet | Operational |  |
| [Cogent Charlotte](https://dchub.cloud/facilities/cogent-communications-inc-cogent-charlotte-3b6ee44a) | Cogent Communications, Inc. | Operational |  |
| [Cogent Charlotte 2](https://dchub.cloud/facilities/cogent-communications-inc-cogent-charlotte-2-09ff83cd) | Cogent Communications, Inc. | Operational |  |
| [Digital Realty CLT (113 N Myers St)](https://dchub.cloud/facilities/digital-realty-digital-realty-clt-113-n-myers-st-d11cb991) | Digital Realty | Operational |  |
| [Digital Realty CLT (125 N Myers St)](https://dchub.cloud/facilities/digital-realty-digital-realty-clt-125-n-myers-st-9fdbb741) | Digital Realty | Operational |  |
| [Flexential - Charlotte/North (CLT4/5)](https://dchub.cloud/facilities/flexential-corp-flexential-charlottenorth-clt45-a8c0cfb1) | Flexential Corp. | Operational |  |
| [Flexential - Charlotte/South (CLT1/2/3)](https://dchub.cloud/facilities/flexential-corp-flexential-charlottesouth-clt123-afaaef5d) | Flexential Corp. | Operational |  |
| [Flexential Charlotte - South](https://dchub.cloud/facilities/flexential-flexential-charlotte-south-e990b1ea) | Flexential | Operational |  |
| [Level(3) Charlotte](https://dchub.cloud/facilities/lumen-technologies-level3-charlotte-17c516de) | Lumen Technologies | Operational |  |
| [Spectrum Charlotte National Data Center](https://dchub.cloud/facilities/spectrum-charlotte-national-data-center-00f9c9ee) |  | Operational |  |
| [TierPoint Charlotte - Center Park](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-charlotte-center-park-e7018824) | TierPoint, LLC | Operational |  |
| [TierPoint Charlotte - North Myers](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-charlotte-north-myers-2212598d) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [North Carolina](https://dchub.cloud/facilities/in/us/north-carolina).

## More on Charlotte

- [Charlotte DCPI score](https://dchub.cloud/dcpi/charlotte)
- [Charlotte market brief](https://dchub.cloud/markets/charlotte/brief)
- [North Carolina data center market brief](https://dchub.cloud/states/north-carolina/brief)
- [North Carolina data center tax incentives](https://dchub.cloud/states/north-carolina/data-center-incentives)

### Email me when the Charlotte DCPI verdict changes

Email me when Charlotte's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Charlotte: 16 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=charlotte) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=charlotte)

JSON: [/api/v1/markets/charlotte/deep-dive](https://dchub.cloud/api/v1/markets/charlotte/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Charlotte","item":"https://dchub.cloud/markets/charlotte"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Charlotte Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:50:10.758325+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/charlotte",
 "wordCount":281,
 "about":{"@type":"Place","name":"Charlotte"},
 "description":"Live data-center market analysis. DCPI score 30.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "charlotte", "name": "Charlotte Data Center Market — DC Hub", "description": "Live data-center market measurements for Charlotte, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/charlotte", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Charlotte"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 16.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:40."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:40.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:40."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/charlotte#webpage", "url": "https://dchub.cloud/markets/charlotte", "name": "Charlotte data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Charlotte data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Charlotte market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Charlotte data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Charlotte market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```