---
description: Is Chantilly a good data center market for power? DCPI verdict AVOID, score 21.0/100 (PJM), as of 2026-11-12. 300 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Chantilly data centers: power, grid and capacity | DC Hub"
---

# Chantilly data center market

Power availability in Chantilly: DCPI verdict AVOID, composite score 21 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 272 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Chantilly data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Chantilly market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.0/100**

MW, all listings**300**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Chantilly at a glance

Chantilly has 300 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (300 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 300 |
| Total listed | 300 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Chantilly

DC Hub does not hold a lease-rate figure for this market yet.

The region recently saw Amazon announce a $100M acquisition for a Chantilly property where it plans to build a data center.

These readings suggest that securing incremental megawatts will require either extended lead times for utility coordination or premium arrangements with power providers.

Deal flow in Chantilly remains concentrated around AWS, which has invested substantially in the region. The operator's $100M property acquisition underscores continued buildout activity despite tight power conditions. H5 Data Centers' seven-site presence represents the second-largest operational footprint, though recent deal announcements have not surfaced new H5 activity in the tracked period. No other major operators have announced recent transactions in Chantilly, leaving the market heavily weighted toward AWS expansion and smaller-scale development.

## Data centers in Chantilly

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Amazon IAD-1](https://dchub.cloud/facilities/amazon-web-services-amazon-iad-1-0520c53a) | Amazon Web Services | Operational | 50 |
| [Amazon IAD-61](https://dchub.cloud/facilities/amazon-web-services-amazon-iad-61-d2c1f8dd) | Amazon Web Services | Operational | 50 |
| [Amazon IAD-9](https://dchub.cloud/facilities/amazon-web-services-amazon-iad-9-71f34c85) | Amazon Web Services | Operational | 50 |
| [Amazon IAD150](https://dchub.cloud/facilities/amazon-web-services-amazon-iad150-aa7beb86) | Amazon Web Services | Operational | 50 |
| [Amazon IAD151](https://dchub.cloud/facilities/amazon-web-services-amazon-iad151-a5ddcb70) | Amazon Web Services | Operational | 50 |
| [Amazon IAD152](https://dchub.cloud/facilities/amazon-web-services-amazon-iad152-d3be72be) | Amazon Web Services | Operational | 50 |
| [4120 Lafayette Center Drive](https://dchub.cloud/facilities/legacy-investing-llc-4120-lafayette-center-drive-e4a1cb94) | Legacy Investing, LLC | Operational |  |
| [Amazon IAD22](https://dchub.cloud/facilities/amazon-web-services-amazon-iad22-2552cce0) | Amazon Web Services | Operational |  |
| [Amazon IAD63](https://dchub.cloud/facilities/amazon-web-services-amazon-iad63-f2ad02a1) | Amazon Web Services | Operational |  |
| [Amazon IAD65](https://dchub.cloud/facilities/amazon-web-services-amazon-iad65-a5ece81f) | Amazon Web Services | Operational |  |
| [Amazon IAD86](https://dchub.cloud/facilities/amazon-web-services-amazon-iad86-eee57037) | Amazon Web Services | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Chantilly

- [Chantilly DCPI score](https://dchub.cloud/dcpi/chantilly)
- [Chantilly market brief](https://dchub.cloud/markets/chantilly/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Chantilly DCPI verdict changes

Email me when Chantilly's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Chantilly: 300 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=chantilly) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=chantilly)

JSON: [/api/v1/markets/chantilly/deep-dive](https://dchub.cloud/api/v1/markets/chantilly/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Chantilly","item":"https://dchub.cloud/markets/chantilly"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Chantilly Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:50:02.300959+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/chantilly",
 "wordCount":272,
 "about":{"@type":"Place","name":"Chantilly"},
 "description":"Live data-center market analysis. DCPI score 21.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "chantilly", "name": "Chantilly Data Center Market — DC Hub", "description": "Live data-center market measurements for Chantilly, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/chantilly", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Chantilly"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 300.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:28."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:28.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:28."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/chantilly#webpage", "url": "https://dchub.cloud/markets/chantilly", "name": "Chantilly data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Chantilly data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Chantilly market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Chantilly data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Chantilly market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
